UC San Diego, Special Collections and Archives
Center for Astrophysics and Space Sciences Records, 1954-1996
Collection context
Summary
- Title:
- Center for Astrophysics and Space Sciences Records
- Dates:
- 1954-1996
- Creators:
- University of California, San Diego. Center for Astrophysics and Space Sciences, Wolfe, Arthur M., Burbidge, E. Margaret, and Peterson, L. E. (Laurence E.)
- Abstract:
- The records of the UCSD Center for Astrophysics and Space Sciences (CASS) include materials related to the administrative functions, research proposals, and projects of CASS, as well as the records of the High Energy Astronomy Group (HEAG).
- Extent:
- 84 Linear feet (84 record cartons)
- Language:
- English
- Preferred citation:
-
Center for Astrophysics and Space Sciences Records, RSS 2104. Special Collections & Archives, UC San Diego.
Background
- Scope and content:
-
The records of the UCSD Center for Astrophysics and Space Sciences are organized into two sections: 1) Center for Astrophysics and Space Sciences (CASS) records, and 2) High Energy Astronomy Group (HEAG) records.
The first section, the Center for Astrophysics and Space Sciences (CASS) records, includes materials related to the administrative functions, research proposals, and projects of CASS. These records document the establishment and development of the Center, and includes the founding materials and bylaws of CASS, correspondence from the director's office, committee meeting minutes and agendas, and research projects.
Arranged in four series: 1) GENERAL RECORDS, 2) CORRESPONDENCE, 3) COMMITTEES AND MEETINGS, and 4) RESEARCH PROJECTS AND PROPOSALS.
The second section, the High Energy Astronomy Group (HEAG) records, include the files and correspondence of HEAG members, as well as HEAG research files, project files, conference papers, and notes. The extensive research and project files document the scientific research and creation of the instruments used on several prominent space missions. This section also contains records documenting a number of NASA missions for which HEAG submitted proposals, but were not chosen. In 1998, the HEAG records were separated from Laurence Peterson's faculty papers and treated as an individual collection. In 2016, it was decided to integrate these records into the CASS collection.
Arranged in 16 series: 1) CORRESPONDENCE, 2) APOLLO MISSIONS, 3) BURST AND TRANSIENT SOURCE EXPERIMENT (BATSE), 4) GAMMA-RAY SPECTROSCOPY EXPERIMENT (GRSE), 5) HIGH ENERGY X-RAY TIMING EXPERIMENT (HEXTE), 6) HIGH ENERGY ASTRONOMICAL OBSERVATORY 1 (HEAO-1), 7) HIGH ENERGY ASTRONOMICAL OBERSVATORY 3 (HEAO-3), 8) LUNAR X-RADIATION AND GAMMA-RADIATION, 9) OCTAHEDRAL RESEARCH SATELLITE 3 (ORS-3), 10) ORBITING SOLAR OBSERVATORY-1 (S-16), 11) ORBITING SOLAR OBSERVATORY-3 (S-57), 12) ORBITING SOLAR OBSERVATORY-7 (OSO-7), 13) SCIENTIFIC BALLOONING, 14) SPACE SHUTTLE – SPACELAB, 15) MEETINGS AND CONFERENCES, and 16) ORIGINALS OF PRESERVATION PHOTOCOPIES.
- Biographical / historical:
-
The UCSD Center for Astrophysics and Space Sciences (CASS) is an organized research unit that was founded in 1979 to provide scientific direction for the interrelated departments of Physics, Chemistry, and Electrical Engineering and Computer Science (EECS) at UCSD. Designed to link scientists and UCSD scientific departments, it provides a unified management structure for handling federally funded space research projects, and strengthened the quality of space science education and research at UCSD. CASS has given administrative support to such projects as the Faint Object Spectrograph on the Hubble Space Telescope, the Gamma-Ray Spectrometers on Apollo missions 15 and 16, and to the High Energy Astrophysics Group (HEAG).
As an interdisciplinary research unit, CASS makes collaboration possible between the disciplines of astronomy, astrophysics, and space sciences, and all of the areas of specialization within those disciplines. CASS provides administrative support for research groups through program coordination, contract and grant administration, and resource allocation. These research groups include faculty, research staff, and graduate students. Examples of CASS research groups include Observational Cosmology, Gravitation Astrophysics, High Energy Astronomy, and Plasma Astrophysics.
Founding administrators hoped the new entity would lead to interdisciplinary opportunities in scientific inquiry and in educational curricula and platforms available to UCSD graduate students. The heightened administrative capability that CASS could provide facilitated the participation in, and sometimes leadership of, large research projects such as the Faint Object Spectrograph on the Hubble Space Telescope, the Long Wavelength Spectrometer on the Keck Telescope, and the Burst and Transient Source Experiment on the Compton Gamma-Ray Observatory.
CASS is managed by a single Director and at least one Associate Director. The director reports to the Office of Research Affairs, and specifically to the Vice Chancellor of Research (VCR) and the Senior Vice Chancellor of Academic Affairs (SVCAA). The founding director of CASS was Dr. Margaret Burbidge (1979-1988), followed by Dr. Laurence Peterson (1988-1997), Dr. Arthur M. Wolfe (1997-2007), and Dr. George Fuller (2007-present). CASS derives its funding and activities from contracts and research grants. The research groups share members and are fluid in their aggregation of personnel and resources, which change according to project priority, funding, and staff availability. Members of CASS serve on various Center committees including the Executive and Policy Committee, the Education Committee, and the Computing Ad Hoc Committee.
High Energy Astronomy Group A large portion of the Center for Astrophysics and Space Sciences Records collection is made up of the records of the High Energy Astronomy Group (HEAG), an interdisciplinary research collaboration committed to the study of x-ray and gamma-ray phenomena of solar, galactic, stellar, and planetary origin. Notable members of the group have included Robert Farnsworth, Duane Gruber, Hugh Hudson, Richard Lingenfelter, James Matteson, Michael Pelling, Laurence Peterson, and Richard Rothschild.
HEAG was created in 1962 with the arrival of Laurence Peterson at UCSD. Peterson had been working on the Orbiting Solar Observatory 1 (OSO-1) mission as a research assistant at the University of Minnesota, and continued his involvement with the project when he accepted the position of assistant professor of physics at UCSD. His work on OSO-1, and his work in high energy astrophysics, attracted the interest and input of UCSD scientists. In 1961, just prior to his move to California, Peterson submitted a proposal to NASA through UCSD with the knowledge that he would soon be moving his work to the university, and with the desire to develop a research program there. The proposal was accepted, and HEAG was created.
The scientific ballooning experiments associated with the planning and development of the OSO missions connected the scientific faculty of the two universities and began a long and fruitful development of x-ray and gamma-ray detectors. The first OSO was launched on March 7, 1962, and the University of Minnesota Gamma-Ray Experiment onboard returned data on low energy gamma-radiation in space. The data includes the participation of researchers and technical support at both institutions, although the prime analysis was accomplished at UCSD. Concurrently, the associated UCSD research staff and graduate students of HEAG were planning experiments for several other missions.
The early 1960s were a time of preparation for the Apollo missions, the Octahedral Research Satellite, the Orbiting Solar Observatories, and other future missions to study solar and cosmic x-ray and gamma-ray phenomena. X-ray and gamma-ray detectors developed by HEAG flew on many of these early missions, providing valuable information on the near-earth radiation environment and on high energy processes on the sun and in the galaxy. Scientific balloons were launched throughout this period to test equipment and to gather exploratory data on solar and on various galactic objects.
The late 1960s brought more projects, and the HEAG began work on instruments for solar observatories and for High Energy Astrophysical Observatories. The high energy monitoring instruments developed for these missions provided data leading to a better understanding of the high energy sky and the processes in stars and stellar objects that produce x-rays and gamma-rays. As the number and frequency of missions increased, the group developed more advanced techniques. Instruments for NASA missions, such as the Solar Maximum Mission (SMM), and experiments for the Space Shuttle were studied in the 1970s. SMM was launched in 1980, and studied high energy phenomena on the sun. Instruments for planetary missions such as Mariner 10 and Voyager were also studied by HEAG.
In 1979, the UCSD Center for Astrophysics and Space Sciences (CASS) was founded, and HEAG officially became an active branch of this larger organization. Information on active galaxies, gamma-ray bursts, pulsars, white dwarfs, neutron stars, and supernovae has been provided by various high energy instruments developed by CASS and HEAG in co-operation with NASA, the Jet Propulsion Laboratory, and other space research organizations. The Gamma-Ray Observatories Gamma-Ray Spectroscopy Experiment (GRSE), part of NASA's Great Observatories Program, and the Burst and Transient Source Experiment (BATSE) were planned and developed in the 1980s. Although the GRSE was not selected for flight, the BATSE was launched on the Compton Gamma-Ray Observatory in April 1991, and has been instrumental in furthering our understanding of the location, nature and source of gamma-ray bursts.
The 1980s also yielded an extensive development and balloon test program to accomplish high resolution gamma-ray spectroscopy, and several studies were made to implement these detection systems on space missions. During the 1990s, the group continued to study the high energy sky with the High Energy X-Ray Timing Experiment on the Rossi X-Ray Timing Explorer (HEXTE), launched on December 30, 1995. The group was also involved with the Faint Object Spectrograph (FOS) on the Hubble Space Telescope, launched in 1989. The FOS has played an important role in the research on black holes and distant galaxies.
- Rules or conventions:
- Describing Archives: A Content Standard
Indexed terms
- Subjects:
- Orbiting astronomical observatories
High Energy Astronomy Observatories
Astrophysics
Astronomy
Cosmochemistry
Gamma ray astronomy
X-ray astronomy - Names:
- University of California, San Diego. Center for Astrophysics and Space Sciences -- Archives
Compton Observatory
University of California, San Diego. Center for Astrophysics and Space Sciences. High Energy Astronomy Group -- Archives
About this collection guide
- Date Encoded:
- This finding aid was produced using ArchivesSpace on 2017-04-25 08:17:22 -0700 .
Access and use
- Restrictions:
-
COLLECTION STORED OFF-SITE. ALLOW ONE WEEK FOR RETRIEVAL OF MATERIALS.
- Preferred citation:
-
Center for Astrophysics and Space Sciences Records, RSS 2104. Special Collections & Archives, UC San Diego.
- Location of this collection:
-
9500 Gilman Drive, Dept. 0175
La Jolla, CA 92093-0175, US
- Contact:
- (858) 534-2533
- Restrictions:
-
COLLECTION STORED OFF-SITE. ALLOW ONE WEEK FOR RETRIEVAL OF MATERIALS.
- Preferred citation:
-
Center for Astrophysics and Space Sciences Records, RSS 2104. Special Collections & Archives, UC San Diego.
- Location of this collection:
-
9500 Gilman Drive, Dept. 0175La Jolla, CA 92093-0175, US
- Contact:
- (858) 534-2533
Contents
CASS Records
Background
- Scope and content:
-
The Center for Astrophysics and Space Sciences (CASS) records, includes materials related to the administrative functions, research proposals, and projects of CASS. These records document the establishment and development of the Center, and includes the founding materials and bylaws of CASS, correspondence from the director's office, committee meeting minutes and agendas, and research projects.
Arranged in four series: 1) GENERAL RECORDS, 2) CORRESPONDENCE, 3) COMMITTEES AND MEETINGS, and 4) RESEARCH PROJECTS AND PROPOSALS.
Contents
GENERAL RECORDS
Background
- Scope and content:
-
Series 1) GENERAL RECORDS. Arranged in six subseries: A) Annual Reports, B) Budgets and Funding, C) Founding Materials, D) Public Relations Materials, E) Research Facilities, and F) Reviews.
Contents
Annual Reports
Contents
1974-1975, 1980-1985
Summary
- Dates:
- 1974-1975, 1980-1985
1985-1989
Summary
- Dates:
- 1985-1989
1989-1994
Summary
- Dates:
- 1989-1994
Budgets and Funding
Contents
Academic administrators, 1980-1981
Summary
- Dates:
- 1980-1981
Business Office, 1980-1986
Summary
- Dates:
- 1980-1986
Business Office - Funding opportunities, 1988-1990
Summary
- Dates:
- 1988-1990
Fundraising, 1987
Summary
- Dates:
- 1987
Founding Materials
Contents
Business Office organization, 1980-1987
Summary
- Dates:
- 1980-1987
Constitutions and bylaws, 1981
Summary
- Dates:
- 1981
History of the organization, 1980-1987
Summary
- Dates:
- 1980-1987
Internal audit with final report, 1987
Summary
- Dates:
- 1987
Long range plans, 1986
Summary
- Dates:
- 1986
Management memoranda, 1980-1982
Summary
- Dates:
- 1980-1982
Management structure and planning, 1980-1981
Summary
- Dates:
- 1980-1981
Planning documents, 1979
Summary
- Dates:
- 1979
Procedure guidelines, 1981
Summary
- Dates:
- 1981
Proposal to Found CASS as an Organized Research Unit (ORU), 1978
Summary
- Dates:
- 1978
Review of Proposal to Found CASS as an ORU, 1981-1987
Summary
- Dates:
- 1981-1987
Public Relations Materials
Contents
Brochure with rough drafts, 1995-1996
Summary
- Dates:
- 1995-1996
Newspaper clippings, 1987
Summary
- Dates:
- 1987
Presentations, 1980
Summary
- Dates:
- 1980
Research Facilities
Contents
Mount Lemmon Agreement, 1980-1983, 1985-1988
Summary
- Dates:
- 1980-1983, 1985-1988
Mount Lemmon proposals, 1987-1988
Summary
- Dates:
- 1987-1988
Mount Lemmon users, 1986
Summary
- Dates:
- 1986
Table Mountain Observatory, 1985
Summary
- Dates:
- 1985
Reviews
Contents
5-Year Review 1 - Draft and final version, 1979-1984
Summary
- Dates:
- 1979-1984
5-Year Review 2 - Director actions and final version, 1984-1989
Summary
- Dates:
- 1984-1989
Panel review, 1987-1989
Summary
- Dates:
- 1987-1989
Response to panel review - Draft, 1984-1989
Summary
- Dates:
- 1984-1989
Response to panel review, 1984-1989
Summary
- Dates:
- 1984-1989
5-Year Review 3 - Draft, 1989-1994
Summary
- Dates:
- 1989-1994
CORRESPONDENCE
Background
- Scope and content:
-
Series 2) CORRESPONDENCE: Includes letters and memoranda from the director and assistant director, as well as internal memoranda and correspondence with granting institutions such as NASA and the Marlar Foundation. Arranged chronologically.
Contents
1979-1991
Summary
- Dates:
- 1979-1991
COMMITTEES AND MEETINGS
Background
- Scope and content:
-
Series 3) COMMITTEES AND MEETINGS. Arranged in two subseries: A) Committees, and B) Meetings.
Contents
Committees
Contents
Advisory Committee for CASS, 1979-1980
Summary
- Dates:
- 1979-1980
Chancellor's Advisory Committee, 1979-1986
Summary
- Dates:
- 1979-1986
Committee to Advise on Staff Affairs, 1986-1990
Summary
- Dates:
- 1986-1990
Committee to Review Policies Affecting Researchers, Specialists and Postdoctoral Scholars, 1990
Summary
- Dates:
- 1990
Computer Operations Committee, 1989-1996
Summary
- Dates:
- 1989-1996
Computing - Ad Hoc Committee, 1988-1989
Summary
- Dates:
- 1988-1989
Computing - Task Force, 1986-1988
Summary
- Dates:
- 1986-1988
Educational Policy and Courses Committee, 1988-1991
Summary
- Dates:
- 1988-1991
Education Committee
Contents
Academic Seminars, 1980-1995
Summary
- Dates:
- 1980-1995
Academic Seminars - Correspondence, 1994
Summary
- Dates:
- 1994
Marlar Distinguished Lecturer, 1980-1988
Summary
- Dates:
- 1980-1988
Memoranda - Laurence Peterson, 1981-1988
Summary
- Dates:
- 1981-1988
Executive and Policy Committee - Memoranda and minutes, 1982-1992
Summary
- Dates:
- 1982-1992
Executive and Policy Committee - Nominations, 1985
Summary
- Dates:
- 1985
Executive Committee Minutes, 1979-1980
Summary
- Dates:
- 1979-1980
New Building Committee - Space Building Planning, 1988-1989
Summary
- Dates:
- 1988-1989
Research Showcase Committee, 1981
Summary
- Dates:
- 1981
Science and Engineering Research Facility (SERF) Building Advisory Committee, 1990-1991
Summary
- Dates:
- 1990-1991
SERF Building Advisory Committee, 1991-1994
Summary
- Dates:
- 1991-1994
Shared System User's Group, 1987
Summary
- Dates:
- 1987
Staff Adminstration Committee, 1980-1981
Summary
- Dates:
- 1980-1981
Meetings
Contents
Faculty Meetings, 1988
Summary
- Dates:
- 1988
Office of Graduate Studies and Research (OGSR) - Directives and information, 1988-1991
Summary
- Dates:
- 1988-1991
OGSR-Organized Research Unit (ORU) Directors' Meeting, 1982-1986
Summary
- Dates:
- 1982-1986
RESEARCH PROJECTS AND PROPOSALS
Background
- Scope and content:
-
Series 4) RESEARCH PROJECTS AND PROPOSALS. Arranged in two subseries: A) Projects, and B) Proposals.
Contents
Projects
Contents
Faint Object Spectrograph (FOS), 1978-1985
Summary
- Dates:
- 1978-1985
Get-Away Specials, 1991
Summary
- Dates:
- 1991
Hubble Space Telescope (HST) Fellowships, 1990-1994
Summary
- Dates:
- 1990-1994
Proposal "Intents", 1990-1992
Summary
- Dates:
- 1990-1992
Proposals
Contents
Adaptive Data Acquisition and Processing System (ADAPS), 1982
Summary
- Dates:
- 1982
Analysis of Solar Flare Spectra, 1984
Summary
- Dates:
- 1984
Analytical and Experimental Studies of Solar High-Energy Phenomena, 1983
Summary
- Dates:
- 1983
Burst and Transient Source Experiment Scintillation Detector Design Support, 1984
Summary
- Dates:
- 1984
Burst and Transient Source Experiment Scintillation Detector Development Support: Qualification Model..., 1985
Summary
- Dates:
- 1985
Calibration and Test Equipment for High Resolution Gamma-Ray Spectrometer Arrays, 1982
Summary
- Dates:
- 1982
CCD Characterization, 1983
Summary
- Dates:
- 1983
Cooperative Studies of the Solar-Flare Energy Budget, 1981
Summary
- Dates:
- 1981
Cooperative Study of the Causes of Line Asymmetry in Solar Flares, 1982
Summary
- Dates:
- 1982
Coordinated Multifrequency Observations of Variable AGNs, 1984
Summary
- Dates:
- 1984
Design and Specifications of Components in the BATSE Experiment on Gamma-Ray Observatory, 1983
Summary
- Dates:
- 1983
Division of Atmospheric Sciences/Solar Terrestrial Research Program, 1984
Summary
- Dates:
- 1984
Fe II Multiplet Observations of Broad Line Radio Galaxies, 1982
Summary
- Dates:
- 1982
Gamma-Ray Bursts: Data Analysis and Instrument Development, 1982
Summary
- Dates:
- 1982
Hard X-Ray and Low Energy Gamma-Ray Experiment: HEAO-1 Data Reduction and Analysis, 1983
Summary
- Dates:
- 1983
Hard X-Ray Scintillator Array for the X-Ray Timing Explorer Experiment Study, 1983
Summary
- Dates:
- 1983
Hard X-Ray Spectroscopy of Cosmic X-Ray Sources, 1981-1982
Summary
- Dates:
- 1981-1982
HEAO-1 Data Reduction and Analysis, 1982-1983
Summary
- Dates:
- 1982-1983
Investigation of NaI Response to 10-100 KeV X-Rays at the Stanford Synchrotron Radiation Laboratory, 1982
Summary
- Dates:
- 1982
Multifrequency Observations of Active Galactic Nuclei, 1982
Summary
- Dates:
- 1982
New Concept for Hard X-Ray/Gamma-Ray Position-Sensitive Detection, 1983
Summary
- Dates:
- 1983
Observational Solar Flare Chromospheric Spectroscopy, 1984
Summary
- Dates:
- 1984
Observational Techniques for Solar Flare Gamma-Rays, Hard X-Rays and Neutrons, 1987
Summary
- Dates:
- 1987
Observations of Solar Hard X-Ray Microflares and Flares on a Long Duration Balloon Flight, 1984
Summary
- Dates:
- 1984
Occultation Studies of the Galactic Center Region Using EXOSAT, 1984
Summary
- Dates:
- 1984
Photometry with Star Trackers, 1983
Summary
- Dates:
- 1983
Radioactive Transfer and Dynamics in QSO Emission Line Clouds, 1982
Summary
- Dates:
- 1982
Reverse Currents and Soft X-Rays in Hydrodynamic Flare Models, 1979
Summary
- Dates:
- 1979
Scientific Applications of a Subsatellite for the Space Station, 1983
Summary
- Dates:
- 1983
Scientific Use of the Aspect Determination System of the AXAF, 1984
Summary
- Dates:
- 1984
Sodium Iodide Response for Gamma-Ray Burst Spectra Investigation, 1982
Summary
- Dates:
- 1982
Solar Flare Radioactive Hydrodynamics, 1982
Summary
- Dates:
- 1982
Spectroscopy Detector for the BATSE of the GRO, 1984
Summary
- Dates:
- 1984
Spectroscopy Modification to the BATSE of the GRO, 1984
Summary
- Dates:
- 1984
Standardized CAMAC Computer Interfacing System for UCSD Astronomy, 1982
Summary
- Dates:
- 1982
Study of Hard X-Ray/Gamma-Ray Position Sensitive Detectors, 1983
Summary
- Dates:
- 1983
Supporting Development for a Network of Long Duration Balloon Gamma-Ray Burst Spectrometers, 1983
Summary
- Dates:
- 1983
Theoretical Chromospheric Flare Dynamics, 1983-1984
Summary
- Dates:
- 1983-1984
Theoretical Investigations of Active Extragalactic Objects, 1982
Summary
- Dates:
- 1982
Theoretical Studies in Gamma-Ray Astrophysics, 1984
Summary
- Dates:
- 1984
UC/MMC Faint Object Spectrograph for the Space Telescope, 1979
Summary
- Dates:
- 1979
UV/Optical/Infrared Observations of Broad Line Radio Galaxies, 1981
Summary
- Dates:
- 1981
Variability Studies of 3C 371, 1984
Summary
- Dates:
- 1984
High Energy Astronomy Group Records
Background
- Scope and content:
-
The High Energy Astronomy Group (HEAG) records, include the files and correspondence of HEAG members, as well as HEAG research files, project files, conference papers, and notes. The extensive research and project files document the scientific research and creation of the instruments used on several prominent space missions. This section also contains records documenting a number of NASA missions for which HEAG submitted proposals, but were not chosen.
Arranged in 16 series: 1) CORRESPONDENCE, 2) APOLLO MISSIONS, 3) BURST AND TRANSIENT SOURCE EXPERIMENT (BATSE), 4) GAMMA-RAY SPECTROSCOPY EXPERIMENT (GRSE), 5) HIGH ENERGY X-RAY TIMING EXPERIMENT (HEXTE), 6) HIGH ENERGY ASTRONOMICAL OBSERVATORY 1 (HEAO-1), 7) HIGH ENERGY ASTRONOMICAL OBERSVATORY 3 (HEAO-3), 8) LUNAR X-RADIATION AND GAMMA-RADIATION, 9) OCTAHEDRAL RESEARCH SATELLITE 3 (ORS-3), 10) ORBITING SOLAR OBSERVATORY-1 (S-16), 11) ORBITING SOLAR OBSERVATORY-3 (S-57), 12) ORBITING SOLAR OBSERVATORY-7 (OSO-7), 13) SCIENTIFIC BALLOONING, 14) SPACE SHUTTLE – SPACELAB, 15) MEETINGS AND CONFERENCES, and 16) ORIGINALS OF PRESERVATION PHOTOCOPIES.
Contents
CORRESPONDENCE
Background
- Scope and content:
-
Series 1) CORRESPONDENCE. Arranged in two subseries: A) Chronological Files, and B) Name Correspondent.
Contents
Chronological Files
Contents
Canfield, Richard C., 1977-1980
Summary
- Dates:
- 1977-1980
Canfield, Richard C., 1981-1985
Summary
- Dates:
- 1981-1985
Hudson, Hugh S., 1969-1988
Summary
- Dates:
- 1969-1988
Rothschild, Richard E., 1986-1987
Summary
- Dates:
- 1986-1987
Group correspondence, 1970
Summary
- Dates:
- 1970
Group correspondence, 1977-
Summary
- Dates:
- 1977-
Name Correspondent
Contents
Kitt Peak National Observatory, 1972-1981
Summary
- Dates:
- 1972-1981
Metzger, Albert (Jet Propulsion Laboratory), 1967
Summary
- Dates:
- 1967
NASA Data Center, 1966-1975
Summary
- Dates:
- 1966-1975
NASA Headquarters, 1966-1976
Summary
- Dates:
- 1966-1976
Stein, Wayne A. - Infrared astronomy, 1966-1972
Summary
- Dates:
- 1966-1972
APOLLO MISSIONS
Background
- Scope and content:
-
Series 2) APOLLO MISSIONS: Apollo 15 and Apollo 16 project planning materials, correspondence regarding missions and instruments, mission proposals, project notebooks, data, and results of electromagnetic radiation tests. Arranged in three subseries: A) General, B) Apollo 15, and C) Apollo 16.
Contents
General
Contents
Planning - Orbital Astronomy Flight Facility - Douglas Missile and Space Systems Division, 1966-1969
Summary
- Dates:
- 1966-1969
Planning - Analysis 1 Notebook, 1971-1972
Summary
- Dates:
- 1971-1972
Correspondence - Apollo Telescope Mount A (ATM) with images, 1967
Summary
- Dates:
- 1967
Correspondence - Electromagnetic radiation mission, 1967-1968
Summary
- Dates:
- 1967-1968
Correspondence - Gamma-ray spectrometer, 1969-1976
Summary
- Dates:
- 1969-1976
Proposals - Gamma-Ray Spectroscopy of Lunar Surface - Principal investigator, James Arnold; Albert Metzger and Laurence Peterson, co-investigators, 1965-1966
Summary
- Dates:
- 1965-1966
Proposals - Photographic Measurement of the Solar F-Corona - Principal investigator, Natalie Kovar, August 1965
Summary
- Dates:
- August 1965
Proposals - To Investigate Rapid Variations of the X-Ray Flux from Solar Flares - Principal investigator, Laurence Peterson, November 1965
Summary
- Dates:
- November 1965
Proposals - Earth Orbital Mission - Principal investigator, James Arnold; co-investigators, Albert Metzger and Laurence Peterson, December 1965
Summary
- Dates:
- December 1965
Proposals - Earth Orbital Mission - Preliminary papers, 1965-1967
Summary
- Dates:
- 1965-1967
Proposals - EMR - Principal investigator, Laurence Peterson, 1967
Summary
- Dates:
- 1967
Proposals - Gamma-Ray Spectrometer - Principal investigator, Albert Metzger, 1969
Summary
- Dates:
- 1969
Proposals - X-Ray and Gamma-Ray Spectroscopy of Cosmic Sources - Principal investigator, Laurence Peterson, 1969
Summary
- Dates:
- 1969
Proposals - Reduction and Analysis of Gamma-Ray Astronomical Data from Apollo 15-16 - UCSD 6287 - Principal investigator, Laurence Peterson, 1973
Summary
- Dates:
- 1973
Instrument drawings - Gamma-ray spectrometer, 1970-1971
Summary
- Dates:
- 1970-1971
Instrument drawings - Scintillation cup, 1962-1963
Summary
- Dates:
- 1962-1963
Testing and review - EMR - Oak Ridge Experiment, 1966
Summary
- Dates:
- 1966
Testing and review - Gamma-ray spectrometer, 1969
Summary
- Dates:
- 1969
Testing and review - Technical Reports - J.P.L., 1969-1971
Summary
- Dates:
- 1969-1971
Project notebooks - Gamma-ray detector - Robert Farnsworth, 1967-1969
Summary
- Dates:
- 1967-1969
Project notebooks - Physics - R. L. Schuh, 1966-1967
Summary
- Dates:
- 1966-1967
Project notebooks - Gamma-Ray notebook, 1966-1970
Summary
- Dates:
- 1966-1970
Data - Gamma-Ray Spectrometer - Data Reduction Reports, 1972-1974
Summary
- Dates:
- 1972-1974
Data - Charts and diagrams, 1974
Summary
- Dates:
- 1974
Results - Apollo 15 and 16 Gamma-Ray Results, Metzger, Albert, et al., 1973
Summary
- Dates:
- 1973
Results - Charts and notes, 1972
Summary
- Dates:
- 1972
Results - Expected Gamma-Ray Emission Spectra from the Lunar Surface as a Function of Chemical Composition, Reedy, R. C., et al., 1972
Summary
- Dates:
- 1972
Results - Radioactivity of the Lunar Surface: Preliminary Results of the Apollo 15 and 16 Gamma-Ray... Metzger, Albert, et al., 1972
Summary
- Dates:
- 1972
Results - Some Correlations Between Measurements by the Apollo GRS and Other Lunar Observations, Metzger and Albert, 1973
Summary
- Dates:
- 1973
Apollo 15
Contents
Planning - Operations Notebook, 1971
Summary
- Dates:
- 1971
Data - The Pasadena Observer - Contains references to missing data on Apollo 16, 1972
Summary
- Dates:
- 1972
Data - Transcript of space flight, 1971
Summary
- Dates:
- 1971
Results - Preliminary Science Report, 1971
Summary
- Dates:
- 1971
Results - Total Cosmic Gamma-Ray Spectrum Between 0.3 and 27 MeV as Measured... Trombka, J. L., et al., 1971
Summary
- Dates:
- 1971
Apollo 16
Contents
Planning - Operations Notebook - Part 1-4, 1972
Summary
- Dates:
- 1972
Testing and review - Simulation - Houston, 1972
Summary
- Dates:
- 1972
Data - Analysis 1 Notebook, 1969-1972
Summary
- Dates:
- 1969-1972
Data - Gamma-ray status charts, 1972
Summary
- Dates:
- 1972
Results - Gamma-Ray Fluxes from the Moon at the Earth, Peterson and Laurence, 1992
Summary
- Dates:
- 1992
Results - Preliminary Science Report - Gamma-Ray Spectrometer Experiment, Arnold, James, et al., 1972
Summary
- Dates:
- 1972
Results - Temporal Variability and Spectrum of a Cosmic Gamma-Ray Event... Trombka, J. I., et al., 1974
Summary
- Dates:
- 1974
BURST AND TRANSIENT SOURCE EXPERIMENT (BATSE)
Background
- Scope and content:
-
Series 3) BURST AND TRANSIENT SOURCE EXPERIMENT (BATSE): Planning, project proposal, data, and results of the Burst and Transient Source Experiment for NASA's Compton Gamma-Ray Observatory. The primary purpose of BASTE was to study gamma-ray bursts, though it also recorded data from other astrophysical phenomena and objects.
Contents
Planning - BATSE modifications and Spectroscopic Transient Event Monitor (STEM), 1980-1981
Summary
- Dates:
- 1980-1981
Planning - Notes and memoranda, 1983-1984
Summary
- Dates:
- 1983-1984
Planning - BATSE detector module requirements, 1984
Summary
- Dates:
- 1984
Planning - BATSE budget, January 1985
Summary
- Dates:
- January 1985
Planning - data management plan, April 1990
Summary
- Dates:
- April 1990
Proposal - Burst and Transient Source Experiment Scintillation Detector Development Support - UCSD 6694, January 1985
Summary
- Dates:
- January 1985
Quarterly review, August 1983
Summary
- Dates:
- August 1983
Data - BATSE detector, October 14-15, 1982
Summary
- Dates:
- October 14-15, 1982
Data - Charts and schedules, March-April 1984
Summary
- Dates:
- March-April 1984
Data - Calculations, October 1984
Summary
- Dates:
- October 1984
Results - "BATSE - GRO Observational Capabilities", October 1983
Summary
- Dates:
- October 1983
GAMMA-RAY SPECTROSCOPY EXPERIMENT
Background
- Scope and content:
-
Series 4) GAMMA-RAY SPECTROSCOPY EXPERIMENT (GRSE): Records pertaining to a proposed experiment involving the Coded Mask Imager (CMI), a gamma-ray imaging instrument, as part of the Gamma-ray Large Area Space Telescope (GLAST) mission. Arranged in nine subseries: A) Planning, B) Chronological Files, C) Team Correspondence, D) Name Correspondence, E) Proposals, F) Team Meetings, G) Suppliers, Equipment and Instruments, H) Testing and Review, and I) Results.
Contents
Planning
Contents
Design of a Gamma-Ray Compton Telescope Using Computers, 1965
Summary
- Dates:
- 1965
Plans and instrument specifications, 1977-1980
Summary
- Dates:
- 1977-1980
Contract and funding charts, 1978
Summary
- Dates:
- 1978
Spitzingsee meeting writeups, 1978
Summary
- Dates:
- 1978
Commissariat a l'Energie Atomique - Saclay - Centre d'Etude Spatial Rayonnements, 1978-1981
Summary
- Dates:
- 1978-1981
Development Plans, 1978-1980
Summary
- Dates:
- 1978-1980
X-ray measurements from GRO, 1979
Summary
- Dates:
- 1979
Organizations notebook, 1979-1985
Summary
- Dates:
- 1979-1985
Program restructuring, 1979
Summary
- Dates:
- 1979
Cost Reduction Plan, 1979
Summary
- Dates:
- 1979
X-Ray Monitor for the GRO, 1979-1981
Summary
- Dates:
- 1979-1981
Performance Assurance Plans, 1979-1980
Summary
- Dates:
- 1979-1980
Budgetary Management, 1980
Summary
- Dates:
- 1980
Overview of GRO, 1980
Summary
- Dates:
- 1980
Development Plan, 1980
Summary
- Dates:
- 1980
Data Reduction and Analysis Plan, 1980
Summary
- Dates:
- 1980
Concept Review, 1980
Summary
- Dates:
- 1980
Data Processing Unit - Statement of Work - Plans, 1980
Summary
- Dates:
- 1980
Scheduling and development, 1980
Summary
- Dates:
- 1980
Statement of Work, 1980
Summary
- Dates:
- 1980
Cost analysis, 1980
Summary
- Dates:
- 1980
Management plan, 1980
Summary
- Dates:
- 1980
Meeting and travel plans, 1980
Summary
- Dates:
- 1980
Investigation Development Plan for the Gamma-Ray Spectroscopy Experiment, 1980
Summary
- Dates:
- 1980
Drafts of plans, 1980
Summary
- Dates:
- 1980
Checkout Equipment Plan, 1980
Summary
- Dates:
- 1980
Gamma-Ray Spectroscopy Experiment for the Gamma-Ray Observatory - Volume I - III, 1980
Summary
- Dates:
- 1980
Plans and Resources for the Germanium Detector Cryogenic Electronic Subsystem - Volume 1 - 2, 1980
Summary
- Dates:
- 1980
Science plan, 1980
Summary
- Dates:
- 1980
Preliminary Execution Phase Documentation - Volume I - II, 1980
Summary
- Dates:
- 1980
Systems Concept Definition Study - Final Report, 1980
Summary
- Dates:
- 1980
Weight Control Plan, 1980
Summary
- Dates:
- 1980
UCSD manpower levels, 1981-1989
Summary
- Dates:
- 1981-1989
Contract and subcontract status and planning, 1981
Summary
- Dates:
- 1981
Explorer Gamma-Ray Experiment Telescope - EGRET, 1987
Summary
- Dates:
- 1987
ICS Gamma-Ray Spectroscopy Plan, undated
Summary
- Dates:
- undated
Requirements [for instrument], undated
Summary
- Dates:
- undated
Chronological Files
Contents
1978 December-1980 April
Summary
- Dates:
- 1978 December-1980 April
1980 May-1981 January
Summary
- Dates:
- 1980 May-1981 January
1981 March-1981 May
Summary
- Dates:
- 1981 March-1981 May
Team Correspondence
Contents
Final memoranda, 1979-1980
Summary
- Dates:
- 1979-1980
General, 1979-1980
Summary
- Dates:
- 1979-1980
Jet Propulsion Laboratory, 1978-1980
Summary
- Dates:
- 1978-1980
Memoranda and transcripts, 1978-1981
Summary
- Dates:
- 1978-1981
NASA - Goddard Space Flight Center, 1979-1981
Summary
- Dates:
- 1979-1981
Saclay (Centre d'Etudes Nucleaires de Saclay - CEN - Saclay), 1978-1981
Summary
- Dates:
- 1978-1981
Sandia Laboratories - Albuquerque, 1978-1980
Summary
- Dates:
- 1978-1980
Name Correspondence
Contents
Ball Aerospace Systems Division (BASD) - Ball Brothers Research Corporation (BBRC), 1978-1980
Summary
- Dates:
- 1978-1980
Hurford, Gordon, 1980
Summary
- Dates:
- 1980
International Telephone and Telegraph - Aerospace, Electronics, Components and Energy Group, 1978-1980
Summary
- Dates:
- 1978-1980
Jet Propulsion Laboratory (JPL), 1979-1981
Summary
- Dates:
- 1979-1981
NASA - Goddard Space Flight Center (GSFC), 1980-1981
Summary
- Dates:
- 1980-1981
NASA Headquarters, 1976-1980
Summary
- Dates:
- 1976-1980
Northwestern University, 1977-1981
Summary
- Dates:
- 1977-1981
Sherman, Alan, 1980
Summary
- Dates:
- 1980
UC San Diego, 1978-1981
Summary
- Dates:
- 1978-1981
UC San Diego - Contractual, 1980-1981
Summary
- Dates:
- 1980-1981
UC San Diego - Internal, 1978-1980
Summary
- Dates:
- 1978-1980
UC San Diego - Team distribution list forms, 1979-1980
Summary
- Dates:
- 1979-1980
UC San Diego - Telephone contact notes, 1979-1980
Summary
- Dates:
- 1979-1980
UC San Diego - Travel approval letters, 1979-1981
Summary
- Dates:
- 1979-1981
Proposals
Contents
Proposal preparation materials, 1978
Summary
- Dates:
- 1978
High Resolution High Sensitivity Observations of Solar Gamma Radiation, 1978
Summary
- Dates:
- 1978
Gamma-Ray Spectroscopy Experiment for the Gamma-Ray Observatory, 1978
Summary
- Dates:
- 1978
Original proposal, 1978-1985
Summary
- Dates:
- 1978-1985
Gamma-Ray Spectroscopy Experiment for the Gamma-Ray Observatory, 1979-1980
Summary
- Dates:
- 1979-1980
Proposal for the GRSE Shield Subsystem Electronics - Volumes I and III, 1980
Summary
- Dates:
- 1980
JPL - Work Breakdown Proposal, 1980
Summary
- Dates:
- 1980
JPL - Science Only Proposal, 1980
Summary
- Dates:
- 1980
Scientific Coordination of Data Reduction and Analysis, 1980
Summary
- Dates:
- 1980
Technical Management Proposal for the Germanium Detector Cryogenic Electronics Subsystem, 1980
Summary
- Dates:
- 1980
Gamma-Ray Observatory - UCSD 6221 - Volumes I and II, 1980
Summary
- Dates:
- 1980
Gamma-Ray Observatory - UCSD 6221 - Final Definition Phase, 1980
Summary
- Dates:
- 1980
First Quarter Proposal - Continuation of Definition Phase, 1980
Summary
- Dates:
- 1980
Gamma-Ray Observatory - Additional Definition Phase Tasks, 1980
Summary
- Dates:
- 1980
Gamma-Ray Observatory - UCSD 6884, December 1980
Summary
- Dates:
- December 1980
Gamma-Ray Observatory - Scientific Work and Technical Progress, 1981
Summary
- Dates:
- 1981
Gamma-Ray Observatory - UCSD 7200, 1981
Summary
- Dates:
- 1981
Gamma-Ray Observatory - Extension of the Definition Phase, 1981
Summary
- Dates:
- 1981
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources, 1984
Summary
- Dates:
- 1984
Solar Terrestrial Program, 1984
Summary
- Dates:
- 1984
Research in Solar Energy Astrophysics, 1988
Summary
- Dates:
- 1988
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources, 1988-1989
Summary
- Dates:
- 1988-1989
The Limitation of Funds Clause, 1989-1991
Summary
- Dates:
- 1989-1991
Research in Solar Physics, 1989
Summary
- Dates:
- 1989
General proposal materials, 1992
Summary
- Dates:
- 1992
Team Meetings
Contents
Pre-proposal discussions, 1977-1978
Summary
- Dates:
- 1977-1978
Project Working Group, September 1978
Summary
- Dates:
- September 1978
Naval Research Laboratory, November 1978
Summary
- Dates:
- November 1978
TRW, March 1979
Summary
- Dates:
- March 1979
Meeting #2 minutes, April 1979
Summary
- Dates:
- April 1979
Project review, April 1979
Summary
- Dates:
- April 1979
BASD - Meeting minutes, May 1979-June 1980
Summary
- Dates:
- May 1979-June 1980
Project review, July 1979
Summary
- Dates:
- July 1979
Minutes, July-September 1979
Summary
- Dates:
- July-September 1979
Saclay - LESR, 1979-1980
Summary
- Dates:
- 1979-1980
Memoranda, 1979-1981
Summary
- Dates:
- 1979-1981
Minutes, 1979 December-1980 February
Summary
- Dates:
- 1979 December-1980 February
Sandia, February 1980
Summary
- Dates:
- February 1980
System Team Meeting Minutes, February 1980
Summary
- Dates:
- February 1980
GRS Conceptual Review, April 1980
Summary
- Dates:
- April 1980
SCDRA Minutes - Sandia, April 1980
Summary
- Dates:
- April 1980
GSFC - Budget and manpower data, May 1980
Summary
- Dates:
- May 1980
Meeting #7 minutes, April 1980
Summary
- Dates:
- April 1980
Science Team minutes, April-May 1980
Summary
- Dates:
- April-May 1980
BASD - Action items and agreements, 1980
Summary
- Dates:
- 1980
GRO - GRSE Review for University and CASS Administration, July 1980
Summary
- Dates:
- July 1980
Germanium Detector (Ged) Subsystem Proposal Review - BASD, July 1980
Summary
- Dates:
- July 1980
Meeting #8 minutes, July 1980
Summary
- Dates:
- July 1980
System Concept Review, September 1980
Summary
- Dates:
- September 1980
GRSE Confirmation Review, October 1980
Summary
- Dates:
- October 1980
Modulator Bar Status Minutes - Saclay, October 1980
Summary
- Dates:
- October 1980
Meeting #9 Minutes, December 1980
Summary
- Dates:
- December 1980
Meeting #9 Minutes, December 1980
Summary
- Dates:
- December 1980
Meeting #10 minutes - Sandia, February 1981
Summary
- Dates:
- February 1981
Review for FOS Management, January 1981
Summary
- Dates:
- January 1981
SCDRA minutes, February 1981
Summary
- Dates:
- February 1981
Cost Reduction Review, February 1981
Summary
- Dates:
- February 1981
Debriefing - NASA Headquarters, March 1981
Summary
- Dates:
- March 1981
Suppliers, Equipment and Instruments
Contents
RCA photomultiplier tubes, 1979
Summary
- Dates:
- 1979
Wide field plantetary camera, 1979
Summary
- Dates:
- 1979
BASD notebooks, 1980
Summary
- Dates:
- 1980
Shield structure shop costs, 1980
Summary
- Dates:
- 1980
Modulator specifications, 1980
Summary
- Dates:
- 1980
Shield Subsystem Proposal - Volume 2 - BBRC, 1980
Summary
- Dates:
- 1980
Subcontracts - BBRC, 1980
Summary
- Dates:
- 1980
Machine shop memos, 1980
Summary
- Dates:
- 1980
E G and G Ortec - Germanium detector (Ged), 1980
Summary
- Dates:
- 1980
Instrument Drawings - GRO-GRSE instrument envelope, 1980
Summary
- Dates:
- 1980
Testing and Review
Contents
Assembly and qualification testing, 1980
Summary
- Dates:
- 1980
Instrument Review, 1980
Summary
- Dates:
- 1980
Confirmation Review, 1980
Summary
- Dates:
- 1980
Matteson's reponses to questions raised at the GRSE Confirmation Review, 1980
Summary
- Dates:
- 1980
Science Review, 1981
Summary
- Dates:
- 1981
Project Overview, 1991
Summary
- Dates:
- 1991
Results
Contents
Detection of Gamma-Ray Lines - Notes and Draft, 1980
Summary
- Dates:
- 1980
Presentation materials, 1986 January
Summary
- Dates:
- 1986 January
HIGH ENERGY X-RAY TIMING EXPERIMENT (HEXTE)
Background
- Scope and content:
-
Series 5) HIGH ENERGY X-RAY TIMING EXPERIMENT (HEXTE): Includes proposal and planning materials, correspondence among project members, testing and review materials, and HEXTE results, including presentation materials.
Contents
Planning - High Energy Timing Explorer (HETE), 1984
Summary
- Dates:
- 1984
Correspondence - Group meetings, 1989-1990
Summary
- Dates:
- 1989-1990
Proposals - HEXTE for the X-Ray Timing Experiment Study - UCSD 6597, 1984
Summary
- Dates:
- 1984
Proposals - HEXTE for the X-Ray Timing Experiment Study - UCSD 6976, 1984
Summary
- Dates:
- 1984
Testing and Review - Science Working Group Review - Meetings minutes, 1991
Summary
- Dates:
- 1991
Testing and Review - Monthly Status Reports, 1991 January-July
Summary
- Dates:
- 1991 January-July
Testing and Review - Monthly Status Reports, 1991 September-1994 July
Summary
- Dates:
- 1991 September-1994 July
Project Notebook - Balloon flights, R. A. Farnsworth, 1968
Summary
- Dates:
- 1968
Results - X-Ray Timing Explorer, 1992
Summary
- Dates:
- 1992
Results - Presentation materials, 1989
Summary
- Dates:
- 1989
HIGH ENERGY ASTRONOMICAL OBSERVATORY 1 (HEAO-1)
Background
- Scope and content:
-
Series 6) HIGH ENERGY ASTRONOMICAL OBSERVATORY 1 (HEAO-1): Documents the first of three spacecraft in NASA's High Energy Astronomy Observatory program, which was designed to survey the sky for x-ray emissions. HEAO-1 was equipped with four sets of instruments, which were called A-1, A-2, A-3, and A-4. Arranged in ten subseries: A) Planning, B) Correspondence, C) Proposals, D) Suppliers and Equipment, E) Systems Design and Operations Data Handbook, F) Instrument Drawings, G) Testing and Review, H) Project Notebooks, I) Data, and J) Results.
Contents
Planning
Contents
Conceptual Design of HEAO, 1969
Summary
- Dates:
- 1969
Definition Meeting - Agenda, 1970 April
Summary
- Dates:
- 1970 April
Quality and Reliability Ground Rules, 1970
Summary
- Dates:
- 1970
Definition Meeting, 1970 July
Summary
- Dates:
- 1970 July
Consortium attempt, 1970
Summary
- Dates:
- 1970
Definition Meeting, October-November 1970
Summary
- Dates:
- October-November 1970
Working agreement and data requirements, 1970
Summary
- Dates:
- 1970
Principal Investigator Meeting, 1970
Summary
- Dates:
- 1970
Statement of Work, 1970
Summary
- Dates:
- 1970
Group Schedule Meetings, 1970-1974
Summary
- Dates:
- 1970-1974
Definition Meeting, 1971 February
Summary
- Dates:
- 1971 February
Statement of Work - Attachment A - Parts 1 and 2, 1971
Summary
- Dates:
- 1971
Cost proposal materials, 1971-1972
Summary
- Dates:
- 1971-1972
Contract End Item Specification for MeV Range X-Ray Telescope, 1971
Summary
- Dates:
- 1971
Experimenter's Working Group meeting, 1971 May
Summary
- Dates:
- 1971 May
Gevaerts diagrams, 1971
Summary
- Dates:
- 1971
Definition Meeting, 1971 May
Summary
- Dates:
- 1971 May
Radioactivity Specifications for HEAO A and B, 1971
Summary
- Dates:
- 1971
Definition Meeting, 1971 May
Summary
- Dates:
- 1971 May
Applicable documents list, 1971-1973
Summary
- Dates:
- 1971-1973
Definition meeting - MSFC directives, 1971 June
Summary
- Dates:
- 1971 June
Acceptance Test Plan, 1971
Summary
- Dates:
- 1971
Data Processing Plan, 1971
Summary
- Dates:
- 1971
Development Test Plan, 1971
Summary
- Dates:
- 1971
Experiment System Verification Plan, 1971
Summary
- Dates:
- 1971
Flight Mission Operational Test Plan, 1971
Summary
- Dates:
- 1971
HEAO Documents Notebook, 1971
Summary
- Dates:
- 1971
Integrated Test Plan, 1971
Summary
- Dates:
- 1971
Definition Meeting, 1971 July
Summary
- Dates:
- 1971 July
Prelaunch Test Plan, 1971
Summary
- Dates:
- 1971
Program Development Plan for MeV Range Gamma-Ray Telescope - Volumes I and II - Programmatic requirements, 1971
Summary
- Dates:
- 1971
Qualification Test Plan, 1971
Summary
- Dates:
- 1971
Quality Assurance Plan, 1971
Summary
- Dates:
- 1971
Evaluation of a Proposed Scintillator Crystal Supplier, 1971
Summary
- Dates:
- 1971
GSE Philosophy and Responsibilities, 1971
Summary
- Dates:
- 1971
Instruments - Request for Proposal, 1971
Summary
- Dates:
- 1971
Model contract, 1971
Summary
- Dates:
- 1971
Configuration Management Plan, 1971
Summary
- Dates:
- 1971
HEAO Workshop, 1971
Summary
- Dates:
- 1971
Meeting - Huntsville, 1971 September
Summary
- Dates:
- 1971 September
AGR 4 Contamination Control Plan, 1971
Summary
- Dates:
- 1971
AGR 4 Contract End Item Specification, 1971
Summary
- Dates:
- 1971
AGR 4 Enginering Plan, 1971
Summary
- Dates:
- 1971
AGR 4 Government Furnished Equipment Requirement, 1971
Summary
- Dates:
- 1971
Quality Program Plan, 1971
Summary
- Dates:
- 1971
AGR 4 Reliability Program Plan, 1971
Summary
- Dates:
- 1971
AGR 4 Safety Program Plan, 1971
Summary
- Dates:
- 1971
Meeting - Huntsville, 1971 November
Summary
- Dates:
- 1971 November
Data Procurement Document, 1971
Summary
- Dates:
- 1971
Experiment Verification Plan, 1971
Summary
- Dates:
- 1971
Project Management Plan for the UCSD MeV Range Gamma-Ray Telescope, 1971
Summary
- Dates:
- 1971
Plan, Make or Buy with references to the AGR 4, 1971
Summary
- Dates:
- 1971
Quality Program Plan - Revisions, 1971
Summary
- Dates:
- 1971
Reliability Program Plan, 1971
Summary
- Dates:
- 1971
Requirements for Performance and Design, 1971
Summary
- Dates:
- 1971
Verification Plans - Revisions, 1971-1972
Summary
- Dates:
- 1971-1972
Ground support and data analysis, 1972
Summary
- Dates:
- 1972
Phase C-D Mission A Guidelines, 1972
Summary
- Dates:
- 1972
UCSD descriptions, 1972
Summary
- Dates:
- 1972
Definition contract, 1972
Summary
- Dates:
- 1972
Meeting - Hunstville, 1972 February
Summary
- Dates:
- 1972 February
Experiment Summary - MeV Range Gamma-Ray Telescope, 1972
Summary
- Dates:
- 1972
Experimenter's Meeting - Phase C-D contract, 1972
Summary
- Dates:
- 1972
Meeting - Huntsville, 1972 March
Summary
- Dates:
- 1972 March
Phase B scheduled costs, 1972
Summary
- Dates:
- 1972
Definition - Scheduling, 1972
Summary
- Dates:
- 1972
AGR 4 Experiment - Program plan discussions, 1972
Summary
- Dates:
- 1972
Data Procurement Document, 1972
Summary
- Dates:
- 1972
Interface Meeting at UCSD, 1972
Summary
- Dates:
- 1972
UCSD grant contracts, 1972-1975
Summary
- Dates:
- 1972-1975
Data Procurement Document, 1972
Summary
- Dates:
- 1972
Project Management Plan, 1972
Summary
- Dates:
- 1972
AGR 4 Experiment Mechanical Interface Control Document, 1972
Summary
- Dates:
- 1972
Electromagnetic Compatibility Requirements, 1972
Summary
- Dates:
- 1972
Preliminary Dynamic Structural Model, 1972
Summary
- Dates:
- 1972
Preliminary Requirements Review at TRW, 1972
Summary
- Dates:
- 1972
Radiation Control Plan, 1972
Summary
- Dates:
- 1972
Reliability Program Plan - Revision A, 1972
Summary
- Dates:
- 1972
Support Equipment Plan, 1972-1974
Summary
- Dates:
- 1972-1974
AGR 4 Preliminary Description, 1972
Summary
- Dates:
- 1972
Cost ceiling, 1972
Summary
- Dates:
- 1972
Principal Investigators Meeting, 1972
Summary
- Dates:
- 1972
Range Safety Manual, 1972
Summary
- Dates:
- 1972
Costs and replanning, 1972
Summary
- Dates:
- 1972
Receiving instructions, 1972
Summary
- Dates:
- 1972
Parts and Materials Processing Plan, 1972
Summary
- Dates:
- 1972
Kennedy Space Center (KSC) Safety Standards, 1972
Summary
- Dates:
- 1972
High voltage design criteria, 1972
Summary
- Dates:
- 1972
AGR 4 - Limited life list, 1972
Summary
- Dates:
- 1972
AGR 4 - Preliminary Failure Mode Effects Analysis, 1972
Summary
- Dates:
- 1972
Experiment Requirements for Missions A and B, 1972
Summary
- Dates:
- 1972
Spacecraft specifications, 1972
Summary
- Dates:
- 1972
Collaboration co-operative - Headquarters redefinition, 1973
Summary
- Dates:
- 1973
HEAO redefinition, 1973
Summary
- Dates:
- 1973
Project redefinition with overview of several HEAO missions, 1973
Summary
- Dates:
- 1973
A 4 Experiment, 1973
Summary
- Dates:
- 1973
Logic Design Review, 1973
Summary
- Dates:
- 1973
Logic Design Review, 1973
Summary
- Dates:
- 1973
Configuration Management Manual, 1973
Summary
- Dates:
- 1973
Management Requirements for HEAO Experiments, 1973
Summary
- Dates:
- 1973
Verification Requirements, 1973
Summary
- Dates:
- 1973
HEAO 1 and 2 spacecraft summary, 1973
Summary
- Dates:
- 1973
Principal Investigator's Meeting, 1973
Summary
- Dates:
- 1973
TRW Experiment Data Questionnaire Meeting - UCSD, 1973
Summary
- Dates:
- 1973
Weight Control and Center of Gravity Determination Plan, 1973
Summary
- Dates:
- 1973
AGR 4 - Data Procurement Document, 1973
Summary
- Dates:
- 1973
Experiment Mission Operations Plan, 1973
Summary
- Dates:
- 1973
Government Furnished Equipment Requirement - Revision A, 1973
Summary
- Dates:
- 1973
Project specification, 1973
Summary
- Dates:
- 1973
Procedures for Performing Failure Mode and Effects Analysis, 1973
Summary
- Dates:
- 1973
Project Management Plan, 1973
Summary
- Dates:
- 1973
Design notes for A 4 experiment, 1973-1975
Summary
- Dates:
- 1973-1975
A 4 Experiment - Electromagnetic Compatibility Control Plan, 1973
Summary
- Dates:
- 1973
A 4 Experiment - Electronic description, 1973
Summary
- Dates:
- 1973
A 4 Experiment - Engineering and Development Plan, 1973
Summary
- Dates:
- 1973
Project Management Plan, 1973
Summary
- Dates:
- 1973
A 4 Experiment - Software Plan, 1973
Summary
- Dates:
- 1973
Support Equipment Plan, 1973
Summary
- Dates:
- 1973
Timeline Committee, 1973
Summary
- Dates:
- 1973
Verification plan revisions, 1973-1975
Summary
- Dates:
- 1973-1975
A 4 Experiment - Contamination Control Plan, 1973
Summary
- Dates:
- 1973
Definition of Experiment A 4 Electrical Interface with Observatory, 1973
Summary
- Dates:
- 1973
Cleanliness and Contamination Control Requirements, 1973
Summary
- Dates:
- 1973
A 4 Experiment - Configuration Management Plan, 1973
Summary
- Dates:
- 1973
A 4 Experiment - Engineering and Development Plan, 1973
Summary
- Dates:
- 1973
Engineering Requirements - Mission B, 1973
Summary
- Dates:
- 1973
General Environmental Test Methods, 1973
Summary
- Dates:
- 1973
Government Furnished Equipment Requirement - Revision B, 1973
Summary
- Dates:
- 1973
Matteson, James. Satellite and its Capabilities to Study the Cosmic Gamma-Ray Bursts, 1973
Summary
- Dates:
- 1973
Mission A data requirements, 1973-1975
Summary
- Dates:
- 1973-1975
Mission Operations Requirements for HEAO Experiments, 1973
Summary
- Dates:
- 1973
Quality Program Plan, 1973
Summary
- Dates:
- 1973
Reliability Quality and Safety Requirements, 1973
Summary
- Dates:
- 1973
Phase B Scheduled Costs - Notebook, 1973
Summary
- Dates:
- 1973
Reference Coordinate Systems, 1973
Summary
- Dates:
- 1973
Thermal Mathematical Model, 1973
Summary
- Dates:
- 1973
Diagrams, 1973
Summary
- Dates:
- 1973
Mission Specification Block 1, 1973
Summary
- Dates:
- 1973
Reliability Program Plan - Revision C, 1973
Summary
- Dates:
- 1973
Safety Program Plan, 1973
Summary
- Dates:
- 1973
Work Breakdown Structure Dictionary, 1973
Summary
- Dates:
- 1973
Technical Directive, 1973-1978
Summary
- Dates:
- 1973-1978
Data Exception Record, 1973
Summary
- Dates:
- 1973
Reliability Program Plan - Revision E, 1973
Summary
- Dates:
- 1973
Verification Requirements - Contractor, 1973
Summary
- Dates:
- 1973
Budgets, 1974-1978
Summary
- Dates:
- 1974-1978
Experiment Mission Operations Plan, 1974
Summary
- Dates:
- 1974
Reliability Program Plan, 1974
Summary
- Dates:
- 1974
Safety Program Plan, 1974
Summary
- Dates:
- 1974
Engineering Requirements - Mission A, 1974
Summary
- Dates:
- 1974
Prime Equipment Detail Specifications for A 4, 1974
Summary
- Dates:
- 1974
Environmental Specifications, 1974
Summary
- Dates:
- 1974
Interface Control Documents (ICD) Identification Matrix, 1974
Summary
- Dates:
- 1974
Mission Timeline, 1974
Summary
- Dates:
- 1974
Electromagnetic Compatibility Control Plan, 1974
Summary
- Dates:
- 1974
Index of Planning Documents, 1974
Summary
- Dates:
- 1974
Naugel Presentation, 1974
Summary
- Dates:
- 1974
Definition of Experiment A 4 Mechanical Requirements with Spacecraft, 1974-1975
Summary
- Dates:
- 1974-1975
Mission Operations Requirements, 1974
Summary
- Dates:
- 1974
Experimenter's Meetings, 1974
Summary
- Dates:
- 1974
Engineering and Development Plan, 1974
Summary
- Dates:
- 1974
Observatory System, 1974
Summary
- Dates:
- 1974
MSFC Experimenter's Meeting, 1975
Summary
- Dates:
- 1975
A 4 Experiment - Expanded Command Listing, 1975
Summary
- Dates:
- 1975
Integrated Checkout Station (ICS) and Experiment Support Equipment (EXSE) Telemetry and Command Communications, 1975
Summary
- Dates:
- 1975
Electrical Parts Selection Requirements and Derating Factors, 1975
Summary
- Dates:
- 1975
Mission Operations Requirements and Definition, 1975
Summary
- Dates:
- 1975
Contamination Control Plan, 1975
Summary
- Dates:
- 1975
Mission Operations Plan, 1975
Summary
- Dates:
- 1975
Quality Program Plan, 1975
Summary
- Dates:
- 1975
UCSD Grant Contracts, 1975-1981
Summary
- Dates:
- 1975-1981
Launch Operations Meeting, 1975
Summary
- Dates:
- 1975
Attitude Control and Determination Support Software Requirements, 1975
Summary
- Dates:
- 1975
Command list, 1975
Summary
- Dates:
- 1975
Instrument Program and Command List (IP and CL), 1975
Summary
- Dates:
- 1975
UCSD-MIT Hard X-Ray and Low Energy Gamma-Ray Experiment, 1975
Summary
- Dates:
- 1975
Mission Control Procedures, 1975
Summary
- Dates:
- 1975
Verification Specifications, 1975
Summary
- Dates:
- 1975
Verification Procedures, 1975
Summary
- Dates:
- 1975
Support Instrumentation Requirements Document, 1976
Summary
- Dates:
- 1976
Program Requirements Document, 1976-1977
Summary
- Dates:
- 1976-1977
ICS Computer Program Requirements Document, 1976
Summary
- Dates:
- 1976
Instrument Backup, 1977
Summary
- Dates:
- 1977
Data Processing Requirements, 1976
Summary
- Dates:
- 1976
Operations Control Center - Functional and Software Requirements, 1976
Summary
- Dates:
- 1976
ICS Computer Program, 1976
Summary
- Dates:
- 1976
Launch Operations Safety Manual, 1976
Summary
- Dates:
- 1976
Launch Operations Meeting, 1976
Summary
- Dates:
- 1976
Attitude Control Requirements, 1976-1977
Summary
- Dates:
- 1976-1977
HEAO- A Observatory Description, 1977
Summary
- Dates:
- 1977
Interface Control Documentation, 1977
Summary
- Dates:
- 1977
Certificates of capability, 1977
Summary
- Dates:
- 1977
HEAO launch, 1977
Summary
- Dates:
- 1977
Meetings, 1977
Summary
- Dates:
- 1977
Program Test Plan for AGR-4, undated
Summary
- Dates:
- undated
Gamma-Ray Instrument Specifications, undated
Summary
- Dates:
- undated
Correspondence
Contents
Ball Brothers - Time Zero, 1972-1977
Summary
- Dates:
- 1972-1977
Central Parts Control, 1972-1974
Summary
- Dates:
- 1972-1974
Contracts Office - Phase B contract and budget, 1971-1972
Summary
- Dates:
- 1971-1972
Contracts Office - Phase C-D, 1972-1977
Summary
- Dates:
- 1972-1977
Cost increases for proposal 7156, 1974-1975
Summary
- Dates:
- 1974-1975
Internal memoranda, 1970-1978
Summary
- Dates:
- 1970-1978
Miscellaneous, 1972
Summary
- Dates:
- 1972
Massachusetts Institute of Technology (MIT), 1972-1979
Summary
- Dates:
- 1972-1979
Moore, Harry (UCSD Contracts and Grants Office), 1973-1975
Summary
- Dates:
- 1973-1975
NASA - GSFC - Outgoing, 1972-1978
Summary
- Dates:
- 1972-1978
NASA - Headquarters, 1970-1971
Summary
- Dates:
- 1970-1971
NASA - Headquarters - Outgoing, 1973-1978
Summary
- Dates:
- 1973-1978
NASA - MSFC, 1970-1976 September
Summary
- Dates:
- 1970-1976 September
NASA - MSFC, 1976 October-1983
Summary
- Dates:
- 1976 October-1983
NASA - MSFC - Contracts, 1971-1977
Summary
- Dates:
- 1971-1977
Office of Naval Research, 1967-1978
Summary
- Dates:
- 1967-1978
Phoswich, 1972-1975
Summary
- Dates:
- 1972-1975
Pre-launch testing, 1972-1977
Summary
- Dates:
- 1972-1977
Pre-launch revisions, 1976-1977
Summary
- Dates:
- 1976-1977
Subcontractors - Outgoing, 1970-1978
Summary
- Dates:
- 1970-1978
TRW, 1970-1977
Summary
- Dates:
- 1970-1977
Proposals
Contents
List of proposals, undated
Summary
- Dates:
- undated
Pre-proposal briefing, 1970
Summary
- Dates:
- 1970
Energy Spectra of Cosmic X-Ray Sources 6 to 400 KeV, 1970
Summary
- Dates:
- 1970
Energy Spectra of Cosmic X-Ray Sources, 1970
Summary
- Dates:
- 1970
Sky Survey Experiment for 0.3 to 10 MeV for Gamma-Ray Sources for HEAO-A - Part 1-2, 1970
Summary
- Dates:
- 1970
MeV Range Gamma-Ray Telescope, 1970-1972
Summary
- Dates:
- 1970-1972
Review of Deliveries (MeV Range Gamma-Ray Telescope Concept), 1971
Summary
- Dates:
- 1971
Infrared X-Ray and Gamma-Ray Astronomy Research, 1971
Summary
- Dates:
- 1971
Failure Mode and Effects Analysis for MeV Range Gamma-Ray Telescope, 1971
Summary
- Dates:
- 1971
Definition Proposal, 1971
Summary
- Dates:
- 1971
Contract End Item Detail Specification Ground Support Equipment for MeV Range Gamma-Ray Telescope, 1971
Summary
- Dates:
- 1971
Phase C-D Proposal, 1971
Summary
- Dates:
- 1971
Blocking Crystal and Intermediate Range Point Mode Detector, 1971
Summary
- Dates:
- 1971
Contract End Item Specification for AGR 4, 1971
Summary
- Dates:
- 1971
Ground Support Equipment for AGR 4, 1971
Summary
- Dates:
- 1971
MeV Range Gamma-Ray Telescope for HEAO-1 - Volume I-III, 1971
Summary
- Dates:
- 1971
MeV Range Gamma-Ray Telescope Ground Support Equipment System, 1971-1972
Summary
- Dates:
- 1971-1972
Schedule Cost Increase, 1972
Summary
- Dates:
- 1972
Sky Experiment for 0.3 - 10 MeV Gamma-Ray Sources, 1972
Summary
- Dates:
- 1972
MeV Range Gamma-Ray Telescope for HEAO-A - Part 2, 1972
Summary
- Dates:
- 1972
Phase B Overrun, 1972
Summary
- Dates:
- 1972
MeV Range Gamma-Ray Telescope for HEAO-A - Part 1, 1972
Summary
- Dates:
- 1972
MeV Range Gamma-Ray Telescope, 1972
Summary
- Dates:
- 1972
MeV Range Gamma-Ray Telescope for HEAO-A, 1972
Summary
- Dates:
- 1972
Mission Redefinition, 1973
Summary
- Dates:
- 1973
X-Ray and Gamma-Ray Astronomy Research Extension of NASA Grant NGL05-005-003, 1973
Summary
- Dates:
- 1973
Early update of FMEA - UCSD 6878, 1974
Summary
- Dates:
- 1974
Gamma-Ray Burst Modification - UCSD 6931, 1974
Summary
- Dates:
- 1974
Project change proposals 1, 1974-1978
Summary
- Dates:
- 1974-1978
HEAO project change proposals 2, 1978
Summary
- Dates:
- 1978
Project change proposals 3, 1974-1978
Summary
- Dates:
- 1974-1978
Project change proposals 4, 1974-1978
Summary
- Dates:
- 1974-1978
A4 re-evaluation - UCSD 7516, 1974-1978
Summary
- Dates:
- 1974-1978
A4 re-evaluation - UCSD 7516A, 1974-1978
Summary
- Dates:
- 1974-1978
FY 1975 effort for gamma-ray burst detector - UCSD 7756, 1974-1975
Summary
- Dates:
- 1974-1975
Award approval forms, 1975
Summary
- Dates:
- 1975
Development of Electronic Subsystem for a Gamma-Ray Burst Detector - UCSD 8166, 1975-1976
Summary
- Dates:
- 1975-1976
Gamma-Ray Burst Modification to the UCSD/MIT HEAO-A Experiment - UCSD 7904, 1975-1976
Summary
- Dates:
- 1975-1976
Analysis of Spare Inventory - UCSD 9054, 1976
Summary
- Dates:
- 1976
Isolation Amplifier Fix For Calibration and Test Unit - UCSD 9053, 1976
Summary
- Dates:
- 1976
Mission extension - UCSD 3717, 1978
Summary
- Dates:
- 1978
Guest investigator program, 1978-1979
Summary
- Dates:
- 1978-1979
Theoretical Studies in Gamma-Ray Line Astronomy - UCSD 4431, 1978
Summary
- Dates:
- 1978
Investigation of Compact Extragalactic X-Ray Sources and Their Relationship to the Diffuse X-Ray Background, 1979
Summary
- Dates:
- 1979
Hard X-Ray and Low Energy Gamma-Ray Experiment for HEAO - Project change proposal - UCSD 6219, 1980
Summary
- Dates:
- 1980
Analytical and Experimental Studies of Solar High Energy Phenomena - UCSD 6017, 1980-1981
Summary
- Dates:
- 1980-1981
Analytical and Experimental Studies of Solar High Energy Phenomena - UCSD 7251, 1981-1982
Summary
- Dates:
- 1981-1982
Analytical and Experimental Studies of Solar High Energy Phenomena - UCSD 9813, 1983-1984
Summary
- Dates:
- 1983-1984
Hard X-Ray and Low Energy Gamma-Ray Experiment - UCSD 6609, 1984-1985
Summary
- Dates:
- 1984-1985
Study of Active Galactic Nuclei Spectra - UCSD 7017, 1985-1986
Summary
- Dates:
- 1985-1986
Gamma-Ray and X-Ray Study of the Galactic Center with Data from the HEAO-1 - UCSD 875976, 1987
Summary
- Dates:
- 1987
Investigation of the Stability of the 60-day Cycle of SMC X-1 - UCSD 875976, 1987
Summary
- Dates:
- 1987
Theoretical Studies in Gamma-Ray Astrophysics - UCSD 895206, 1988-1989
Summary
- Dates:
- 1988-1989
Analysis of the Contribution of Starburst Galaxies to the Cosmic X-Ray Background - UCSD 886653, 1988
Summary
- Dates:
- 1988
Theoretical Studies in Gamma-Ray Astrophysics - UCSD 895030, 1988
Summary
- Dates:
- 1988
Contribution of Starburst Galaxies to the Cosmic X-Ray Background - UCSD 895674, 1988-1989
Summary
- Dates:
- 1988-1989
Research in High Energy Astrophysics - UCSD 896491, 1989-1991
Summary
- Dates:
- 1989-1991
HEAO A 4 Astrophysics Center Funding - UCSD 896049, 1989-1990
Summary
- Dates:
- 1989-1990
Suppliers and Equipment
Contents
Proposals for Gamma-Ray Telescope - Bendix and Time Zero, 1970-1971
Summary
- Dates:
- 1970-1971
Proposals for Gamma-Ray Telescope - Bendix and Time Zero, 1970-1971
Summary
- Dates:
- 1970-1971
Proposals for Gamma-Ray Telescope - Bendix and Time Zero, 1970-1971
Summary
- Dates:
- 1970-1971
Proposals for Gamma-Ray Telescope - Time Zero and Electronic Communications Incorporated, 1970-1971
Summary
- Dates:
- 1970-1971
Proposals for Gamma-Ray Telescope - Time Zero and Electronic Communications Incorporated, 1970-1971
Summary
- Dates:
- 1970-1971
Study of the HEAO - Brochure, 1970
Summary
- Dates:
- 1970
Gulton Industries packet, 1970
Summary
- Dates:
- 1970
Component parts and materials list for MEV range gamma-ray telescope - 20 - 6000, 1971
Summary
- Dates:
- 1971
Procurement specifications, 1971
Summary
- Dates:
- 1971
Time Zero - Subcontract negotiation, 1972
Summary
- Dates:
- 1972
Time Zero - Conference reports, 1972
Summary
- Dates:
- 1972
RFQs - Bids - P. O.s - C/O, 1972-1974
Summary
- Dates:
- 1972-1974
Phoswich - RFQ and bids, 1972-1975
Summary
- Dates:
- 1972-1975
DCA reliabilty laboratory contracts - Semiconductors, 1972-1977
Summary
- Dates:
- 1972-1977
Miscellaneous equipment, 1972-1975
Summary
- Dates:
- 1972-1975
Time Zero - Purchase contracts, 1972
Summary
- Dates:
- 1972
Time Zero - Purchase contract appendices E and F, 1972
Summary
- Dates:
- 1972
Time Zero - Ball Brothers merger, 1972-1973
Summary
- Dates:
- 1972-1973
Time Zero - Transmittal notices, 1972-1973
Summary
- Dates:
- 1972-1973
Time Zero - Contracts and correspondence, 1973
Summary
- Dates:
- 1973
CSI blocking crystals, 1973
Summary
- Dates:
- 1973
RCA contracts - C-MOS, 1973-1977
Summary
- Dates:
- 1973-1977
Time Zero - Subcontracts, 1973-1974
Summary
- Dates:
- 1973-1974
ITT Cannon Electric contracts - Connectors, 1973-1976
Summary
- Dates:
- 1973-1976
Process bulletins, 1974
Summary
- Dates:
- 1974
Support software, 1974
Summary
- Dates:
- 1974
A 4 data package - Point mode shield, 1974-1975
Summary
- Dates:
- 1974-1975
A 4 data package - Diffuse mode shield, 1974-1975
Summary
- Dates:
- 1974-1975
A 4 data package - Point mode shield, 1974-1975
Summary
- Dates:
- 1974-1975
A 4 data package - Point mode detector 1, 1974-1975
Summary
- Dates:
- 1974-1975
A 4 data package - Point mode shield, 1974-1975
Summary
- Dates:
- 1974-1975
Integrated Checkout Station (ICS) - Support Equipment (SE), 1974-1975
Summary
- Dates:
- 1974-1975
Time Zero - Amendments to purchase contract, 1974-1975
Summary
- Dates:
- 1974-1975
A 4 data package - Diffuse mode shield, 1974-1975
Summary
- Dates:
- 1974-1975
DCA reliability laboratory contracts - C-MOS screening, 1974-1977
Summary
- Dates:
- 1974-1977
A 4 data package - Diffuse mode shield, 1975
Summary
- Dates:
- 1975
A 4 data package - Point mode detector, 1975
Summary
- Dates:
- 1975
A 4 data package - Point mode shield 2, 1975
Summary
- Dates:
- 1975
A 4 data package - Point mode shield 3, 1975
Summary
- Dates:
- 1975
Electrical checkout system design specification - 20100131, 1975
Summary
- Dates:
- 1975
A 4 data package - Detector 2, 1975
Summary
- Dates:
- 1975
Engineering orders, 1975
Summary
- Dates:
- 1975
A 4 data package - DPU assembly, 1975
Summary
- Dates:
- 1975
A 4 data package - Detector 2, 1975
Summary
- Dates:
- 1975
A 4 data package - RPHA electronic assembly, 1975
Summary
- Dates:
- 1975
A 4 data package - Particle monitor 2, 1975
Summary
- Dates:
- 1975
A 4 data package - Point mode detector, 1975
Summary
- Dates:
- 1975
A 4 instrument telemetry data map, 1976
Summary
- Dates:
- 1976
Low voltage power supplies design specification, 1976
Summary
- Dates:
- 1976
A 4 experiment expanded command list, 1976
Summary
- Dates:
- 1976
Systems Design and Operations Data Handbook
Contents
Volume 1, and 3-5, 1976
Summary
- Dates:
- 1976
Instrument Drawings
Contents
Component positioner, 1969
Summary
- Dates:
- 1969
Bracket, 1969
Summary
- Dates:
- 1969
Plate and sticks, 1969
Summary
- Dates:
- 1969
Printed wiring board - 110700, 1969
Summary
- Dates:
- 1969
Printed wiring board - 110820, 1969
Summary
- Dates:
- 1969
Schematic thermal compensation network - 110760, 1969
Summary
- Dates:
- 1969
Resistors, matched set - 110560, 1969
Summary
- Dates:
- 1969
Schematic test point attenuator - 110800, 1970
Summary
- Dates:
- 1970
Component positioner - 110730, 1970
Summary
- Dates:
- 1970
Cover, WB - 110981, 1970
Summary
- Dates:
- 1970
Solar cell, holder - 110580, 1970
Summary
- Dates:
- 1970
Terminal - 10001 - 11038, 1970
Summary
- Dates:
- 1970
Holding fixture - welded module - 100030 - 110279, 1970
Summary
- Dates:
- 1970
Printed wiring board - 110710, 1970
Summary
- Dates:
- 1970
Component positioner - 110780, 1970
Summary
- Dates:
- 1970
Component positioner - 110970, 1970
Summary
- Dates:
- 1970
Shielding - 111020, 1970
Summary
- Dates:
- 1970
Welded module test pulser - 111010, 1970
Summary
- Dates:
- 1970
Welded module test pulser - 110960, 1970
Summary
- Dates:
- 1970
Welded module - 110950, 1970
Summary
- Dates:
- 1970
Soldered module +12V regulator - 110530, 1970
Summary
- Dates:
- 1970
Welded module - 110810, 1970
Summary
- Dates:
- 1970
Analog switch - 110720, 1970
Summary
- Dates:
- 1970
Assembly - 110620, 1970
Summary
- Dates:
- 1970
Accumulator output gating - 110640, 1970
Summary
- Dates:
- 1970
Soldered module amplifier - Offset - Gate - 110550, 1970
Summary
- Dates:
- 1970
Printed wiring board PCU - 110670, 1970
Summary
- Dates:
- 1970
Component positioner - 110515 - 110519, 1970
Summary
- Dates:
- 1970
Printed wiring board - 110770, 1970
Summary
- Dates:
- 1970
High voltage module - 110750, 1970
Summary
- Dates:
- 1970
Screw, socket head - 110610, 1970
Summary
- Dates:
- 1970
Plate, sticks - 111030, 1970
Summary
- Dates:
- 1970
Upper clock countdown - 110660, 1970
Summary
- Dates:
- 1970
HXR channel counter and address - 110990, 1970
Summary
- Dates:
- 1970
Wired for test: subassembly - 111040, 1970
Summary
- Dates:
- 1970
DSF word counter - 110650, 1970
Summary
- Dates:
- 1970
Time mode trigger calibration timer - 111000, 1970
Summary
- Dates:
- 1970
Schematic sun gate amplifier - 110790, 1970
Summary
- Dates:
- 1970
Module: subcom control - 111070, 1970
Summary
- Dates:
- 1970
Printed wiring board A, B 631-633 - 111060, 1970
Summary
- Dates:
- 1970
Logic diagram - DSF transfer control - 111050, 1970
Summary
- Dates:
- 1970
Solid state detector - 110540, 1970
Summary
- Dates:
- 1970
Solid state detector - 110570, 1970
Summary
- Dates:
- 1970
Hole locator, cover - 110600, 1970
Summary
- Dates:
- 1970
State word counter and bit decoder - 110630, 1970
Summary
- Dates:
- 1970
Amplifier - Offset - Gate - 110520, 1970
Summary
- Dates:
- 1970
Welded module - 110501 - 110514, 1971
Summary
- Dates:
- 1971
Wiring diagram - 110680, 1971
Summary
- Dates:
- 1971
UCSD gamma-ray telescope - 20105831, 1973
Summary
- Dates:
- 1973
UCSD gamma-ray telescope - Burst processor - 20101100, 1974
Summary
- Dates:
- 1974
UCSD gamma-ray telescope - 20101001, 1974
Summary
- Dates:
- 1974
UCSD gamma-ray telescope - 20101105, 1974
Summary
- Dates:
- 1974
UCSD gamma-ray telescope - 20101104, 1974
Summary
- Dates:
- 1974
UCSD gamma-ray telescope - 20102500, 1974
Summary
- Dates:
- 1974
UCSD gamma-ray telescope - 20102200, 1975
Summary
- Dates:
- 1975
UCSD gamma-ray telescope - 20105731, 1975
Summary
- Dates:
- 1975
UCSD gamma-ray telescope - 20103100, 1975
Summary
- Dates:
- 1975
UCSD gamma-ray telescope - 20105030, 1975
Summary
- Dates:
- 1975
UCSD gamma-ray telescope - 20101150, 1975
Summary
- Dates:
- 1975
UCSD gamma-ray telescope - 20101110, 1975
Summary
- Dates:
- 1975
UCSD gamma-ray telescope - 20101101, 1975
Summary
- Dates:
- 1975
UCSD gamma-ray telescope - 20102010, 1975
Summary
- Dates:
- 1975
UCSD gamma-ray telescope (blocking crystal) - 20105100, 1976
Summary
- Dates:
- 1976
UCSD gamma-ray telescope - 20105270, 1976
Summary
- Dates:
- 1976
UCSD gamma-ray telescope - 20105701, 1976
Summary
- Dates:
- 1976
UCSD gamma-ray telescope - 20105941, 1976
Summary
- Dates:
- 1976
UCSD gamma-ray telescope - 20105000, 1976
Summary
- Dates:
- 1976
UCSD gamma-ray telescope - 20101018, 1976
Summary
- Dates:
- 1976
UCSD gamma-ray telescope - 20101102, 1976
Summary
- Dates:
- 1976
UCSD gamma-ray telescope - 20101000, 1977
Summary
- Dates:
- 1977
Testing and Review
Contents
Test procedures, 1970
Summary
- Dates:
- 1970
Spacecraft Electrical Compatibility - Experiment, 1970
Summary
- Dates:
- 1970
Briefing to Experimenters, 1970
Summary
- Dates:
- 1970
Science Steering Committee, 1970-1975
Summary
- Dates:
- 1970-1975
Mission A experiments, 1971
Summary
- Dates:
- 1971
Briefing to Experimenters, 1971
Summary
- Dates:
- 1971
Financial recaps, 1971-1981
Summary
- Dates:
- 1971-1981
Progress Reports, 1971-1972
Summary
- Dates:
- 1971-1972
Design Review, 1971
Summary
- Dates:
- 1971
Preliminary Requirements Review, 1971
Summary
- Dates:
- 1971
Data Requirements Review, 1971
Summary
- Dates:
- 1971
AGR-4 Experiment Status Review, 1971
Summary
- Dates:
- 1971
Mission A experiments, 1972
Summary
- Dates:
- 1972
AGR-4 Experiment Technical Review, 1972
Summary
- Dates:
- 1972
Review Meetings, 1972-1975
Summary
- Dates:
- 1972-1975
Marshall Space Flight Center (MSFC) Directives, 1972-1975
Summary
- Dates:
- 1972-1975
Quick look data reduction, 1972-1976
Summary
- Dates:
- 1972-1976
Project change proposals, 1972-1974
Summary
- Dates:
- 1972-1974
Progress and Status Reports, 1972-1974
Summary
- Dates:
- 1972-1974
Radiation control, 1972
Summary
- Dates:
- 1972
Reflective Coating Preliminary Report, 1972
Summary
- Dates:
- 1972
Surface Preparation and Reflective Coating Considerations for CsI(Na) Scintillation Shield Crystals, 1972
Summary
- Dates:
- 1972
Experiment Test Requirements, 1972
Summary
- Dates:
- 1972
Requirements Baseline Review and Quarterly Review, 1972
Summary
- Dates:
- 1972
Experiment specifications, 1972
Summary
- Dates:
- 1972
Electrical Spacecraft Simulator Preliminary Design Review, 1972
Summary
- Dates:
- 1972
Preliminary Design Review (PDR), 1972
Summary
- Dates:
- 1972
PDR Meeting, 1972
Summary
- Dates:
- 1972
Progress Reports, 1972-1974
Summary
- Dates:
- 1972-1974
Mission A experiments, 1973
Summary
- Dates:
- 1973
Attitude Performance with RCS Control, 1973
Summary
- Dates:
- 1973
Repeat Review, 1973
Summary
- Dates:
- 1973
Verification Integration Working Group, 1973
Summary
- Dates:
- 1973
Bi-monthly Review, 1973 June
Summary
- Dates:
- 1973 June
Blocking crystal, 1973
Summary
- Dates:
- 1973
A 4 Experiment Status Review, 1973
Summary
- Dates:
- 1973
Bi-monthly Review - A 4, 1973 August
Summary
- Dates:
- 1973 August
Bi-monthly Status Review - HEAO-A, 1973 August
Summary
- Dates:
- 1973 August
Phase C-D meetings, 1973
Summary
- Dates:
- 1973
Phoswich test data and specifications, 1973
Summary
- Dates:
- 1973
A 4 Experiment status review, 1973
Summary
- Dates:
- 1973
Financial spreadsheets, 1974-1978
Summary
- Dates:
- 1974-1978
Quarterly Review, 1974
Summary
- Dates:
- 1974
Requirements and test schedules, 1974-1976
Summary
- Dates:
- 1974-1976
A 4 failure mode effects analysis, 1974
Summary
- Dates:
- 1974
A 4 results of outgoing tests, 1974
Summary
- Dates:
- 1974
Preliminary Design Review, 1974
Summary
- Dates:
- 1974
Preliminary Design Review - Fact finding, 1974
Summary
- Dates:
- 1974
Progress and Status Reports, 1974-1975
Summary
- Dates:
- 1974-1975
Naugel dry run, 1974
Summary
- Dates:
- 1974
Experiment Mission Operations Requirements, 1974
Summary
- Dates:
- 1974
Science Steering Committee Meetings, 1974-1976
Summary
- Dates:
- 1974-1976
Attitude and aspect, 1974-1975
Summary
- Dates:
- 1974-1975
Bi-monthly Review, 1975
Summary
- Dates:
- 1975
Project change proposals, 1975
Summary
- Dates:
- 1975
Communications and Tape Recorder Subsystem - PDR, 1975
Summary
- Dates:
- 1975
Communications and Tape Recorder Subsystem - PDR - Appendices, 1975
Summary
- Dates:
- 1975
Reaction Control EFFV Subsystem - PDR, 1975
Summary
- Dates:
- 1975
Attitude Control and Determination Subsystem - PDR, 1975
Summary
- Dates:
- 1975
Attitude Control and Determination Subsystem - Volume 1, 1975
Summary
- Dates:
- 1975
Attitude Control and Determination Subsystem - Volume 2, 1975
Summary
- Dates:
- 1975
Attitude Control and Determination Subsystem - Volume 3, 1975
Summary
- Dates:
- 1975
Electrical Subsystem Preliminary Design Review - Volume 1, 1975
Summary
- Dates:
- 1975
A 4 - Failure Mode and Effect Analysis, 1975
Summary
- Dates:
- 1975
Meeting, 1975 March
Summary
- Dates:
- 1975 March
MSFC Experiment Bi-monthly Review, 1975
Summary
- Dates:
- 1975
PDR - Volume 1, 1975
Summary
- Dates:
- 1975
PDR - Volume 4, 1975
Summary
- Dates:
- 1975
PDR - Volume 5, 1975
Summary
- Dates:
- 1975
PDR - Volume 6, 1975
Summary
- Dates:
- 1975
PDR - Volume 8, 1975
Summary
- Dates:
- 1975
PDR - Volume 9, 1975
Summary
- Dates:
- 1975
Progress Reports, 1975
Summary
- Dates:
- 1975
Critical Design Review (CDR), 1975
Summary
- Dates:
- 1975
MSFC Tri-annual Review, 1975
Summary
- Dates:
- 1975
Science Steering Committee (SSC) Experimenters Tri-Annual Review Meeting, 1975
Summary
- Dates:
- 1975
Command and Data Handling Subsystem - CDR - Volume 1 - Book 1 - Parts 1 and 2, 1975
Summary
- Dates:
- 1975
Command and Data Handling Subsystem - CDR - Volume 1 - Book 2 - Part 2, 1975
Summary
- Dates:
- 1975
Command and Data Handling Subsystem - CDR - Volume 3, 1975
Summary
- Dates:
- 1975
Bi-monthly Status Review, 1975
Summary
- Dates:
- 1975
Automatic data processing equipment - CDR, 1975
Summary
- Dates:
- 1975
Project change proposals, 1975-1978
Summary
- Dates:
- 1975-1978
Bi-monthly Review, 1975
Summary
- Dates:
- 1975
Communications and Tape Recorder Subsystem - CDR - Volume 1, 1975
Summary
- Dates:
- 1975
Communications and Tape Recorder Subsystem - CDR - Volume 2, 1975
Summary
- Dates:
- 1975
Communications and Tape Recorder Subsystem - CDR - Volume 3, 1975
Summary
- Dates:
- 1975
Communications and Tape Recorder Subsystem - CDR - Volume 4, 1975
Summary
- Dates:
- 1975
ETR facility requirements - Revision 1, 1975
Summary
- Dates:
- 1975
Integrated testing, 1975
Summary
- Dates:
- 1975
Thermal Design Integration SEM - CDR - Volumes 1 and 2, 1975
Summary
- Dates:
- 1975
Attitude Control and Determination Subsystem - CDR, 1975
Summary
- Dates:
- 1975
Electrical Subsystem - CDR, 1975
Summary
- Dates:
- 1975
Integrated Checkout Station Software (ICS) - CDR - Volume 1, 1975
Summary
- Dates:
- 1975
ICS - CDR - Appendix, 1975
Summary
- Dates:
- 1975
ICS - CDR - Volume 2, 1975
Summary
- Dates:
- 1975
Tri-annual Management Review, 1975
Summary
- Dates:
- 1975
Failure mode and effects analysis, 1975
Summary
- Dates:
- 1975
Program Review, 1975
Summary
- Dates:
- 1975
Failure Mode and Effects Analysis - Parts 1 and 2, 1975
Summary
- Dates:
- 1975
Critical Design Review - Action item summary, 1976
Summary
- Dates:
- 1976
Observatory system - CDR, 1976
Summary
- Dates:
- 1976
Command requests document, 1976
Summary
- Dates:
- 1976
Telemetry list, 1976
Summary
- Dates:
- 1976
Thermal vacuum test, 1976
Summary
- Dates:
- 1976
A 4 Experiment Pre-Flight Review, 1976
Summary
- Dates:
- 1976
Preshipment Review, 1976
Summary
- Dates:
- 1976
Pre-Flight Review Meeting, 1976
Summary
- Dates:
- 1976
HEAO-1 Scientists Conference, 1976
Summary
- Dates:
- 1976
Justification for Program Extension, 1976
Summary
- Dates:
- 1976
Logic documentation, undated
Summary
- Dates:
- undated
Project Notebooks
Contents
Robert Farnsworth - Record of meetings regarding equipment purchase and review, 1970-1971
Summary
- Dates:
- 1970-1971
Robert Farnsworth - Daybook of meetings regarding equipment, launch, and data reduction, 1971-1972
Summary
- Dates:
- 1971-1972
Robert Farnsworth - Daybook recording meetings regarding equipment, 1972
Summary
- Dates:
- 1972
Douglas P. Smith - Notes, instructions and tests regarding the Sylgard, 1972
Summary
- Dates:
- 1972
Robert Farnsworth - Daybook recording shipment of materials, meetings between HEAG and TRW, and equipment analysis, 1972-1973
Summary
- Dates:
- 1972-1973
Equipment calculations by Gerald C. Day, 1973
Summary
- Dates:
- 1973
Robert Farnsworth - Daybook recording equipment purchases and reductions, 1973-1974
Summary
- Dates:
- 1973-1974
Robert Farnsworth - Daybook recording meetings concerning equipment and subcontracts, 1974
Summary
- Dates:
- 1974
Robert Farnsworth - Daybook recording meetings regarding equipment, 1974-1975
Summary
- Dates:
- 1974-1975
Robert Farnsworth - Daybook recording meetings with TRW regarding equipment as well as general mission operations, 1975
Summary
- Dates:
- 1975
Robert Farnsworth - Daybook with burst detector figures, experiment test specifications and financial calculations, 1975-1976
Summary
- Dates:
- 1975-1976
Robert Farnsworth - Daybook with financial figures and flight readiness review, 1976-1977
Summary
- Dates:
- 1976-1977
Data
Contents
A 4 individual burst data, 1977 August 16
Summary
- Dates:
- 1977 August 16
A 4 individual burst data, 1977 August 17
Summary
- Dates:
- 1977 August 17
A 4 individual burst data, 1977 August 18
Summary
- Dates:
- 1977 August 18
A 4 individual burst data - LASS bursts, 1977 October 4-1978 November
Summary
- Dates:
- 1977 October 4-1978 November
A 4 individual burst data, 1977 October 14
Summary
- Dates:
- 1977 October 14
A 4 individual burst data - Including particle event, 1977 October 14
Summary
- Dates:
- 1977 October 14
A 4 individual burst data, 1977 October 20
Summary
- Dates:
- 1977 October 20
A 4 individual burst data, 1977 October 29
Summary
- Dates:
- 1977 October 29
A 4 individual burst data - Cyg X-1 - 189963, 1977 November 9
Summary
- Dates:
- 1977 November 9
A 4 individual burst data, 1977 November 10
Summary
- Dates:
- 1977 November 10
A 4 individual burst data, 1977 November 12
Summary
- Dates:
- 1977 November 12
A 4 individual burst data - Cyg X-1 - 206914, 1977 November 17
Summary
- Dates:
- 1977 November 17
A 4 individual burst data, 1977 November 24
Summary
- Dates:
- 1977 November 24
A 4 individual burst data - Solar flare, 1978 January 8
Summary
- Dates:
- 1978 January 8
A 4 individual burst data - A 2 burst candidate, 1978 March 15
Summary
- Dates:
- 1978 March 15
A 4 individual burst data, 1978 March 17
Summary
- Dates:
- 1978 March 17
A 4 individual burst data, 1978 March 25
Summary
- Dates:
- 1978 March 25
A 4 individual burst data - Shields, 1978 March 25
Summary
- Dates:
- 1978 March 25
A 4 individual burst data, 1978 March 30
Summary
- Dates:
- 1978 March 30
A 4 individual burst data - 492937, 1978 April 2
Summary
- Dates:
- 1978 April 2
A 4 individual burst data - GRPB and shields, 1978 April 17
Summary
- Dates:
- 1978 April 17
A 4 individual burst data, 1978 April 17
Summary
- Dates:
- 1978 April 17
A 4 individual burst data - MPHH, 1978 April 17
Summary
- Dates:
- 1978 April 17
A 4 individual burst data - RPHA, 1978 April 17
Summary
- Dates:
- 1978 April 17
A 4 individual burst data - Lunch talk, 1978 April 17
Summary
- Dates:
- 1978 April 17
A 4 individual burst data - 541746 Cyg X-1, 1978 April 25
Summary
- Dates:
- 1978 April 25
A 4 individual burst data - A0535 + 262, 1978 April
Summary
- Dates:
- 1978 April
A 4 individual burst data - 565598, 1978 May 6
Summary
- Dates:
- 1978 May 6
A 4 individual burst data - 6B780506 RPHA, 1978 May 6
Summary
- Dates:
- 1978 May 6
A 4 individual burst data - A, 1978 May 8
Summary
- Dates:
- 1978 May 8
A 4 individual burst data - Cyg X-1, 1978 May 9
Summary
- Dates:
- 1978 May 9
A 4 individual burst data - 569915, 1978 May 9
Summary
- Dates:
- 1978 May 9
A 4 individual burst data, 1978 May 18
Summary
- Dates:
- 1978 May 18
A 4 individual burst data, 1978 May 19
Summary
- Dates:
- 1978 May 19
A 4 individual burst data, 1978 May 21
Summary
- Dates:
- 1978 May 21
A 4 individual burst data - Parts 1 and 2, 1978 June 8
Summary
- Dates:
- 1978 June 8
A 4 individual burst data - RPHA, 1978 June 8
Summary
- Dates:
- 1978 June 8
A 4 individual burst data - Parts 1 and 2, 1978 June 30
Summary
- Dates:
- 1978 June 30
A 4 individual burst data - Parts 1 and 2, 1978 July 6
Summary
- Dates:
- 1978 July 6
A 4 individual burst data - MPHA, 1978 July 6
Summary
- Dates:
- 1978 July 6
A 4 individual burst data - Solar flare, 1978 July 11
Summary
- Dates:
- 1978 July 11
A 4 individual burst data - 713095, 1978 July 15
Summary
- Dates:
- 1978 July 15
A 4 individual burst data, 1978 July 24
Summary
- Dates:
- 1978 July 24
A 4 individual burst data, 1978 July 31
Summary
- Dates:
- 1978 July 31
A 4 individual burst data, 1978 August 5
Summary
- Dates:
- 1978 August 5
A 4 individual burst data, 1978 September 21
Summary
- Dates:
- 1978 September 21
A 4 individual burst data - B, 1978 October 6
Summary
- Dates:
- 1978 October 6
A 4 individual burst data, 1978 October 25
Summary
- Dates:
- 1978 October 25
A 4 individual burst data, 1978 November 4
Summary
- Dates:
- 1978 November 4
A 4 individual burst data - Burst, 1978 November 19
Summary
- Dates:
- 1978 November 19
A 4 individual burst data, 1978 December 20
Summary
- Dates:
- 1978 December 20
A 4 individual burst data - A - 1060610, 1978 December 27
Summary
- Dates:
- 1978 December 27
A 4 individual burst data - B - RPHA De-15, 1978 December 27
Summary
- Dates:
- 1978 December 27
A 4 individual burst data - B, 1978 December 27
Summary
- Dates:
- 1978 December 27
A 4 individual burst data - 1064890, 1978 December 29
Summary
- Dates:
- 1978 December 29
A 4 individual burst data - A 2 burst candidate, 1978 December 29
Summary
- Dates:
- 1978 December 29
A 4 individual burst data, 1979 January 7
Summary
- Dates:
- 1979 January 7
A 4 individual burst data, 1979 January 13
Summary
- Dates:
- 1979 January 13
A 4 individual burst data - EXOSAT, 1979 March 5
Summary
- Dates:
- 1979 March 5
A 4 individual burst data, 1979 March 5
Summary
- Dates:
- 1979 March 5
A 4 individual burst data - 830816, 1979 March 5
Summary
- Dates:
- 1979 March 5
A 4 individual burst data - A 2 transients, undated
Summary
- Dates:
- undated
Data processing status, 1981
Summary
- Dates:
- 1981
Galactic center charts and analysis, 1981
Summary
- Dates:
- 1981
Analysis, 1982
Summary
- Dates:
- 1982
Completion of optical discs, 1988-1989
Summary
- Dates:
- 1988-1989
MED states - Event and sample distributions, 1989
Summary
- Dates:
- 1989
Pedestal location studies, 1989
Summary
- Dates:
- 1989
LED states - LED sample and event distribution for Sco-X-1, 1989
Summary
- Dates:
- 1989
MED event and sample distributions for brightest sources, 1989
Summary
- Dates:
- 1989
Balloon program preliminary scientific data, 1989
Summary
- Dates:
- 1989
HED states events and sample distributions for brightest sources, 1989
Summary
- Dates:
- 1989
Transfer DHL to optical disc, 1989
Summary
- Dates:
- 1989
RPHA event and other distributions, 1989
Summary
- Dates:
- 1989
Optical disc stuff {sic}, 1988-1989
Summary
- Dates:
- 1988-1989
Aperture response to point and earth, 1990
Summary
- Dates:
- 1990
Patch SAA detector, 1990
Summary
- Dates:
- 1990
SAA 25 minute cut, 1990
Summary
- Dates:
- 1990
First MED run with background analysis, 1990
Summary
- Dates:
- 1990
Detector availability, 1990
Summary
- Dates:
- 1990
D 4 runs - GB test - Parts 1 and 2, 1990
Summary
- Dates:
- 1990
Source code, 1990
Summary
- Dates:
- 1990
D 4 runs - GM test, 1990
Summary
- Dates:
- 1990
Response cut activation spectra - HED/RPHA gain, 1990
Summary
- Dates:
- 1990
Initial reliability studies of HEAO results, 1990
Summary
- Dates:
- 1990
Data processing program printout, 1990
Summary
- Dates:
- 1990
Sky fits 1-2, 1990
Summary
- Dates:
- 1990
Blue notebook, 1990
Summary
- Dates:
- 1990
Yellow notebook, 1991
Summary
- Dates:
- 1991
Orange notebook, 1991
Summary
- Dates:
- 1991
Gray notebook - Cf DEG and MSB results, 1991
Summary
- Dates:
- 1991
Results
Contents
A 4 Monthly Reports, 1978
Summary
- Dates:
- 1978
Annual Report, 1978
Summary
- Dates:
- 1978
APS Conference Presentation on Scorpius X-1, 1978-1979
Summary
- Dates:
- 1978-1979
Cosmic X-Ray Experiment Aboard HEAO-1, 1978
Summary
- Dates:
- 1978
Diffuse Cosmic Gamma Radiation Measured by HEAO-1, 1993-1995
Summary
- Dates:
- 1993-1995
Diffuse background - Data notes and charts, 1977-1979
Summary
- Dates:
- 1977-1979
Discovery of a 30.5 Day Periodicity in LMC X-4, 1981
Summary
- Dates:
- 1981
Discovery of a Transient MeV Range Gamma-Ray Source, 1993-1995
Summary
- Dates:
- 1993-1995
Emissions from the Galactic Center Region, 1977-1983
Summary
- Dates:
- 1977-1983
Fireball Model for Gamma-Ray Burst, 1983 March 25
Summary
- Dates:
- 1983 March 25
Gamma Ray Burst Seminar, undated
Summary
- Dates:
- undated
Gamma-Ray Lines and Future Prospects: Interpretations and Implications of Gamma-Ray Lines from Solar..., 1981
Summary
- Dates:
- 1981
Gamma-Ray Line Astrophysics, undated
Summary
- Dates:
- undated
NASA - HEAO-1 Group Achievement Award, 1978
Summary
- Dates:
- 1978
Hard X-Ray Astrophysics, 1981
Summary
- Dates:
- 1981
Hard X-Ray Background, 1991
Summary
- Dates:
- 1991
High Energy Astrophysical Observatory, 1971
Summary
- Dates:
- 1971
HEAO Weekly Status Reports, 1977-1978
Summary
- Dates:
- 1977-1978
High Energy Astronomy Observatory: HEAO-1, 1981
Summary
- Dates:
- 1981
HEAO - A 4 - UCSD Progress Report, 1979
Summary
- Dates:
- 1979
High Energy X-Ray Survey of the Sky - Notes and charts, 1976-1979
Summary
- Dates:
- 1976-1979
Long Term Hard X-Ray Observations of Scorpius X-1 from HEAO - 1, 1983
Summary
- Dates:
- 1983
NASA Headquarters Data Analysis Review, 1984
Summary
- Dates:
- 1984
HEAO -1 Newsletter, 1977-1978
Summary
- Dates:
- 1977-1978
Results - "Non-Thermal Hard X-Ray Emission for the Nucleus NGC 1275", 1981
Summary
- Dates:
- 1981
Notes and viewgraphs from various seminars, 1982-1983
Summary
- Dates:
- 1982-1983
Observation of an Absorption Feature in a Gamma-Ray Spectrum, 1983
Summary
- Dates:
- 1983
Observatories of Continuum X-Ray and Gamma-Ray Emission from the Galactic Center, 1982
Summary
- Dates:
- 1982
Observations of Diffuse Galactic Positron Annihiliation Radiation, 1993
Summary
- Dates:
- 1993
HEAO -1 Observations of the Perseus Cluster Above 10 keV, 1981
Summary
- Dates:
- 1981
Progress report with lists of publications and presentations, 1978-1979
Summary
- Dates:
- 1978-1979
Project Scientist Report, 1978
Summary
- Dates:
- 1978
Publications list, 1971
Summary
- Dates:
- 1971
Science news briefing, 1977
Summary
- Dates:
- 1977
Search for Gamma-Ray Spectral Lines from the Galactic Center, 1978
Summary
- Dates:
- 1978
Spectrum of the Gamma-Ray Diffuse Component Observed from HEAO-1, 1985
Summary
- Dates:
- 1985
Dependence of the Pulse Shape of Hercules X-1, 1981
Summary
- Dates:
- 1981
Two Binary Cycles of GX 301-2
Viewgraphs and seminars, 1968-1979
Summary
- Dates:
- 1968-1979
Viewgraphs for Budapest - Cygnus X-1, 1977-1978
Summary
- Dates:
- 1977-1978
X-Ray and UV Emission from Active Galactic Nuclei, 1984
Summary
- Dates:
- 1984
X-Ray Spectrum of AM Hercules from 0.1 to 150 keV, 1981
Summary
- Dates:
- 1981
HIGH ENERGY ASTRONOMICAL OBSERVATORY 3 (HEAO-3)
Background
- Scope and content:
-
Series 7) HIGH ENERGY ASTRONOMICAL OBERSVATORY 3 (HEAO-3): Documents the proposal, planning, and results of the HEAO-3, which researched x-rays, gamma-rays, and cosmic rays.
Contents
Planning - Design Approach Booklet - Parts 1 and 2, 1974
Summary
- Dates:
- 1974
Planning - Mission Specification Block I, 1974
Summary
- Dates:
- 1974
Planning - HEAO-C Description, 1979
Summary
- Dates:
- 1979
Proposals - Theoretical Studies in Gamma-Ray Line Astronomy - UCSD 5454, 1980-1981
Summary
- Dates:
- 1980-1981
Proposals - HEAO-C-1 - Scientific Analysis and Support by UCSD CASS - UCSD 5171, 1980
Summary
- Dates:
- 1980
Proposals - Theoretical Studies in Gamma-Ray Astrophysics - UCSD 6914, 1985
Summary
- Dates:
- 1985
Results - Nature of the Annihilation Radiation and Gamma-Ray Continuum, 1989
Summary
- Dates:
- 1989
Results - Compton Backscattered 511 KeV Annihilation Line Emission and the 179 KeV Line from the Galactic Center, 1990
Summary
- Dates:
- 1990
LUNAR X-RADIATION AND GAMMA-RADIATION
Background
- Scope and content:
-
Series 8) LUNAR X-RADIATION AND GAMMA-RADIATION: Records pertaining to a proposed experiment involving a gamma-ray spectrometer for the Lunar Polar Orbiter (LPO). Includes proposals, planning materials, and correspondence.
Contents
Planning - Gamma-Ray Spectroscopy Experiment (GRSE) for the Lunar Polar Orbiter (LPO), 1966-1967
Summary
- Dates:
- 1966-1967
Planning - Anchored IMP, 1967-1968
Summary
- Dates:
- 1967-1968
Planning - High Energy Astrophysics from the Moon, 1990
Summary
- Dates:
- 1990
Correspondence - Arnold, James, 1971-1973
Summary
- Dates:
- 1971-1973
Correspondence - Lunar Polar Orbiter - Predefinition phase, 1973-1976
Summary
- Dates:
- 1973-1976
Correspondence - Miscellaneous, 1967-1973
Summary
- Dates:
- 1967-1973
Proposals - GRSE for the LPO - UCSD 2008, 1967
Summary
- Dates:
- 1967
Proposals - Development of a Lunar Gamma-Ray Experiment - UCSD 2096, 1967
Summary
- Dates:
- 1967
Proposals - Combined Pulse Neutron Experiment Probe, 1967-1971
Summary
- Dates:
- 1967-1971
Proposals - Development of a Lunar Gamma-Ray Experiment, 1968
Summary
- Dates:
- 1968
Proposals - Gamma-Ray and X-Ray Mapping of Lunar Surface Composition, 1968
Summary
- Dates:
- 1968
Proposals - Gamma-Ray Spectrometer for LPO, 1975
Summary
- Dates:
- 1975
Proposals - Development of an Orbital Gamma-Ray Experiment for Lunar Planetary Geochemistry - UCSD 1860, 1980-1981
Summary
- Dates:
- 1980-1981
Suppliers and Equipment - Analog Technology Corporation (ATC), 1967
Summary
- Dates:
- 1967
OCTAHEDRAL RESEARCH SATELLITES 3 and 4 (ORS-3 and ORS-4)
Background
- Scope and content:
-
Series 9) OCTAHEDRAL RESEARCH SATELLITE 3 and 4 (ORS-3 and ORS-4): Documents the ORS-3 and ORS-4 satellites, which were both equipped to detect x-rays and gamma-rays and which observed cosmic high energy. Arranged in three subseries: A) Environmental Research Satellite 17 (ERS-17), B) Environmental Research Satellite 18 (ERS-18), and C) General and Instrument Drawings.
A) Environmental Research Satellite 17 (ERS-17): Contains correspondence, project documentation, data results, and reports of the ERS-17, aka the ORS-3 satellite. The Octahedral Research Satellites were also part of the Environmental Research Satellites series, and therefore have both ORS and ERS names. ERS-17 is the other designation of the ORS-3 satellite.
B) Environmental Research Satellite 18 (ERS-18): Contains proposal and project documentation, data results, and reports of the ERS-18, aka the ORS-4 satellite. The Octahedral Research Satellites were also part of the Environmental Research Satellites series, and therefore have both ORS and ERS names. ERS-18 is the other designation of the ORS-4 satellite.
C) General and Instrument Drawings: Contains drawings of the various instruments used on the Octahedral Research Satellites. Also included are proposals, project notebooks, and data notes.
Contents
Environmental Research Satellite 17 (ERS-17)
Contents
Correspondence - Miscellaneous, 1966-1970
Summary
- Dates:
- 1966-1970
Project notebook - Analog tape history - Volumes 1 and 2, 1965
Summary
- Dates:
- 1965
Project notebook - Magnetic tape history - Volume 2, 1966
Summary
- Dates:
- 1966
Results - Reports and figures, 1967
Summary
- Dates:
- 1967
Results - Satellite and reduction systems, 1967
Summary
- Dates:
- 1967
Results - Housekeeping Data, 1967
Summary
- Dates:
- 1967
Environmental Research Satellite 18 (ERS-18)
Contents
Results - Final Report, 1968
Summary
- Dates:
- 1968
Planning - Data reduction cost schedules, 1972
Summary
- Dates:
- 1972
Proposals - Data Reduction and Analysis for ERS-18 - Phase I and II - UCSD 2162, 1967
Summary
- Dates:
- 1967
Testing and review - Progress Reports - AF49(638)1702, 1966-1970
Summary
- Dates:
- 1966-1970
Project notebook, 1967-1969
Summary
- Dates:
- 1967-1969
Project notebook, 1967-1968
Summary
- Dates:
- 1967-1968
Project notebook, 1967-1971
Summary
- Dates:
- 1967-1971
Data - Data Reduction and Analysis, 1968-1969
Summary
- Dates:
- 1968-1969
Data - Progress log, 1973
Summary
- Dates:
- 1973
Data - Data reduction instructions, undated
Summary
- Dates:
- undated
Data - History log, undated
Summary
- Dates:
- undated
Results - Cosmic Gamma-Ray Experiment, 1970
Summary
- Dates:
- 1970
Results - "Cosmic Gamma-Ray Spectrum Near One MeV Observed by the ERS-18 Satellite", 1969
Summary
- Dates:
- 1969
Results - "Cosmic Gamma-Ray Spectrum Near One MeV Observed by the ERS-18 Satellite", 1969
Summary
- Dates:
- 1969
Results - "New Component of Cosmic Rays Near One MeV Observed by ERS-18", 1970
Summary
- Dates:
- 1970
Results - "New Component of Cosmic Gamma-Rays Near One MeV Observed by the ERS-18 Satellite", 1970
Summary
- Dates:
- 1970
Results - Stecker's theory, 1967-1972
Summary
- Dates:
- 1967-1972
General and Instrument Drawings
Contents
Proposals - Reduction and Analysis of ORS-3 Data - UCSD 1652, 1965
Summary
- Dates:
- 1965
Proposals - Data Reduction Contract - AF49(638)1702, 1966-1969
Summary
- Dates:
- 1966-1969
Suppliers and equipment - Parts list, 1965
Summary
- Dates:
- 1965
Instrument drawings - Baffle - Low energy detector, 1965
Summary
- Dates:
- 1965
Instrument drawings - Cascade negative pulse amplifier, 1965
Summary
- Dates:
- 1965
Instrument drawings - Cascade negative pulse amplifier emitter follower, 1965
Summary
- Dates:
- 1965
Instrument drawings - Log count rate and one-shot low count, 1965
Summary
- Dates:
- 1965
Instrument drawings - Dual phoswich positive discriminator, 1965
Summary
- Dates:
- 1965
Instrument drawings - ORS outline, 1965-1966
Summary
- Dates:
- 1965-1966
Instrument drawings - Structure assembly spacecraft, 1965-1968
Summary
- Dates:
- 1965-1968
Instrument drawings - Anti-coincidence circuit, 1965
Summary
- Dates:
- 1965
Instrument drawings - Divider and adder network, 1965
Summary
- Dates:
- 1965
Instrument drawings - Geiger binary and buffer, 1965
Summary
- Dates:
- 1965
Instrument drawings - Log count rate and one-shot high count, 1965
Summary
- Dates:
- 1965
Instrument drawings - Log count rate and one-shot low count, 1965
Summary
- Dates:
- 1965
Instrument drawings - Log count rate high count, 1965
Summary
- Dates:
- 1965
Instrument drawings - Log count rate meter, 1965
Summary
- Dates:
- 1965
Instrument drawings - Log count rate meter 300 - 300KC, 1965
Summary
- Dates:
- 1965
Instrument drawings - Matrix, 1965
Summary
- Dates:
- 1965
Instrument drawings - Negative pulse discriminator, 1965
Summary
- Dates:
- 1965
Instrument drawings - Negative pulse discriminator and 60 KC log count rate, 1965
Summary
- Dates:
- 1965
Instrument drawings - Phoswich gating, 1965
Summary
- Dates:
- 1965
Instrument drawings - Phoswich negative pulse amplifier and negative pulse discriminator, 1965
Summary
- Dates:
- 1965
Instrument drawings - Phoswich pulse amplifier, 1965
Summary
- Dates:
- 1965
Instrument drawings - Phoswich selector, 1965
Summary
- Dates:
- 1965
Instrument drawings - Solid state detector negative pulse amplifier, 1965
Summary
- Dates:
- 1965
Instrument drawings - Sun sensor 22295 schematic 22296, 1965
Summary
- Dates:
- 1965
Instrument drawings - Amplifier phoswich selector, 1965
Summary
- Dates:
- 1965
Instrument drawings - Log count rate and one-shot high count 100-100 KC and 3-300 KC, 1965
Summary
- Dates:
- 1965
Instrument drawings - Scaler gates, 1965
Summary
- Dates:
- 1965
Instrument drawings - Solid state pre-amp 222301 and 222302 schematics, 1965
Summary
- Dates:
- 1965
Instrument drawings - Phoswich scaler, 1965
Summary
- Dates:
- 1965
Instrument drawings - Commutator, 1965
Summary
- Dates:
- 1965
Instrument drawings - Structure temperature calibration, undated
Summary
- Dates:
- undated
Project notebook by L. Huzar, 1965-1966
Summary
- Dates:
- 1965-1966
Project notebook, 1966-1967
Summary
- Dates:
- 1966-1967
Data - Notes, 1970
Summary
- Dates:
- 1970
Data - Printout, 1972
Summary
- Dates:
- 1972
ORBITING SOLAR OBSERVATORY - 1 (S-16)
Background
- Scope and content:
-
Series 10) ORBITING SOLAR OBSERVATORY-1 (S-16): Documentation of the x-ray and gamma-ray spectrometer studies of solar electromagnetic radiation conducted aboard NASA's OSO-1. Includes planning and proposal materials, testing and data documentation, photographs, instrument drawings, and reports.
Contents
Planning - General OSO-D, E, F and G spacecraft manual, 1966
Summary
- Dates:
- 1966
Planning - Minnesota Gamma-Ray Experiment, 1960
Summary
- Dates:
- 1960
Planning - Description of University of Minnesota Gamma-Ray Experiment with images, 1961
Summary
- Dates:
- 1961
Proposals - S-16 data reduction - UCSD 1011 revised - UCSD 1119, 1962
Summary
- Dates:
- 1962
Proposals - NASA for Research to be Conducted by the University of Minnesota, 1962
Summary
- Dates:
- 1962
Proposals - X-Ray and Gamma-Ray Astronomy Experiments, 1962
Summary
- Dates:
- 1962
Proposals - 0.3-10 MeV Solar and Cosmic Gamma-Ray Experiment for OSOI, 1966
Summary
- Dates:
- 1966
Instrument Drawings - Refrigeration can assembly, 1960-1962
Summary
- Dates:
- 1960-1962
Instrument Drawings - S16a layout, 1960-1961
Summary
- Dates:
- 1960-1961
Instrument Drawings - Electronics, 1960
Summary
- Dates:
- 1960
Instrument Drawings - S-16 unit 2, 1960
Summary
- Dates:
- 1960
Instrument Drawings - Photocell blocks, 1960-1961
Summary
- Dates:
- 1960-1961
Photographs - Laurence Peterson's sketches for slides, 1961
Summary
- Dates:
- 1961
Photographs - Figure 9 - Orbiting Solar Observatory, 1962-1964
Summary
- Dates:
- 1962-1964
Testing and Review - Data Reduction and progress reports, 1962-1964
Summary
- Dates:
- 1962-1964
Testing and Review - Progress Reports, 1963-1967
Summary
- Dates:
- 1963-1967
Project Notebooks by L. Huszar - S-16 Decommutation and Merge Progress, 1964-1966
Summary
- Dates:
- 1964-1966
Data Reduction Requirments Reports, 1961
Summary
- Dates:
- 1961
Data - Channel 7 gamma-ray detectors, 1962 March 7-10
Summary
- Dates:
- 1962 March 7-10
Data - Cosmic ray production of gamma-rays - Notebook, 1962-1963
Summary
- Dates:
- 1962-1963
Data - Crab Nebula - Notes and calculations, 1962-1963
Summary
- Dates:
- 1962-1963
Data - Orbit and direction - Notebook, 1962-1964
Summary
- Dates:
- 1962-1964
Data - Budgets for data reduction, 1963-1965
Summary
- Dates:
- 1963-1965
Data - Contract for data reduction, 1963-1966
Summary
- Dates:
- 1963-1966
Data - Memoranda regarding data reduction, 1963-1967
Summary
- Dates:
- 1963-1967
Data reduction from Minnesota and California, 1964
Summary
- Dates:
- 1964
Data - Notes, 1965
Summary
- Dates:
- 1965
Data - Pass log, 1965
Summary
- Dates:
- 1965
Flight map with data, undated
Summary
- Dates:
- undated
Results - Gamma-Ray Production by Cosmic Rays, by Laurence Peterson, 1967
Summary
- Dates:
- 1967
Results - Preliminary Report, 1962
Summary
- Dates:
- 1962
Results - Preliminary and final report with graph, 1962
Summary
- Dates:
- 1962
Results - Upper Limits of Cosmic Gamma-Ray Flux, 1965
Summary
- Dates:
- 1965
ORBITING SOLAR OBSERVATORY - 3 (S-57)
Background
- Scope and content:
-
Series 11) ORBITING SOLAR OBSERVATORY-3 (S-57): Documentation of the OSO-3 mission, which measured solar electromagnetic radiation with ultraviolet, x-ray, and gamma-ray spectrometers and telescopes. Arranged in eight subseries: A) Planning, B) Correspondence, C) Proposals, D) Suppliers, Equipment and Instruments, E) Project Notebooks, F) Data, G) Testing and Review, and H) Results.
Contents
Planning
Contents
Balloon servo, 1961-1963
Summary
- Dates:
- 1961-1963
Gamma-Ray Experiment, 1962
Summary
- Dates:
- 1962
X-Ray Experiment, 1962
Summary
- Dates:
- 1962
Experimenter's Manual, 1963
Summary
- Dates:
- 1963
Cosmic x-ray detector, 1964
Summary
- Dates:
- 1964
Solar flares - Research materials, 1964-1968
Summary
- Dates:
- 1964-1968
Correspondence
Contents
Ball Brothers Research Corporation (BBRC), 1964-1970
Summary
- Dates:
- 1964-1970
General, 1960-1969
Summary
- Dates:
- 1960-1969
NASA, 1966-1968
Summary
- Dates:
- 1966-1968
Proposals
Contents
X-Ray Experiment for S-57 Satellite - UCSD 1011, 1963
Summary
- Dates:
- 1963
Data Reduction Funding for OSO-3 - University of California X-Ray Experiment - UCSD 1491, 1965
Summary
- Dates:
- 1965
Data Reduction Funding OSO-E1 - University of California X-Ray Experiment - UCSD 1755, 1966
Summary
- Dates:
- 1966
Data Reduction for OSO-C, 1963-1967
Summary
- Dates:
- 1963-1967
Additional Subcontractor Support for OSO-E1 - University of California X-Ray Experiment - UCSD 2044, 1967
Summary
- Dates:
- 1967
Data Reduction for OSO-3 - University of California X-Ray Experiment - UCSD 2255, 1967
Summary
- Dates:
- 1967
Final Data Reduction for OSO-3 - UCSD X-Ray Experiment - UCSD 2716, 1968
Summary
- Dates:
- 1968
Final Data Reduction for OSO-3 - UCSD X-Ray Experiments, 1969
Summary
- Dates:
- 1969
Infrared X-Ray and Gamma-Ray Astronomy Research - UCSD 3226, 1969
Summary
- Dates:
- 1969
Continuation of OSO-3 Data Analysis - UCSD 4666, 1971
Summary
- Dates:
- 1971
Suppliers, Equipment and Instruments
Contents
Special purpose equipment from Heath Company, 1955-1958
Summary
- Dates:
- 1955-1958
Meeting of Experiments, 1962
Summary
- Dates:
- 1962
BBRC subcontract, 1963-1967
Summary
- Dates:
- 1963-1967
NASA contract, 1967-1969
Summary
- Dates:
- 1967-1969
Instrument drawings - Amplifier and anode current monitor assembly, 1963
Summary
- Dates:
- 1963
Instrument drawings - Chassis, 1966
Summary
- Dates:
- 1966
Project Notebooks
Contents
Magnetic tape, 1964-1966
Summary
- Dates:
- 1964-1966
Isotropic monitor - David L. McKenzie, 1965-1966
Summary
- Dates:
- 1965-1966
Well crystal flights - David L. McKenzie, 1967
Summary
- Dates:
- 1967
Daily log and PHA study - David L. McKenzie, 1969
Summary
- Dates:
- 1969
Magnetic tape history, 1970
Summary
- Dates:
- 1970
Data
Contents
Subcommutator data conversion tables, 1966-1967
Summary
- Dates:
- 1966-1967
Processing Plan, 1966
Summary
- Dates:
- 1966
Solar x-ray events, 1967-1968
Summary
- Dates:
- 1967-1968
Catalog 1, 1967
Summary
- Dates:
- 1967
Catalog 2, 1967-1968
Summary
- Dates:
- 1967-1968
Non-descript curves, 1968-1969
Summary
- Dates:
- 1968-1969
Charts, 1969
Summary
- Dates:
- 1969
Dead time, 1969
Summary
- Dates:
- 1969
Eclipse analysis, 1970
Summary
- Dates:
- 1970
Pulse pileup, undated
Summary
- Dates:
- undated
Catalog of Hard Solar X-Ray Bursts Observed, 1973
Summary
- Dates:
- 1973
Testing and Review
Contents
Progress Reports, 1963-1967
Summary
- Dates:
- 1963-1967
Experiment Checkout Questionnaire, 1964
Summary
- Dates:
- 1964
Final Report, 1965
Summary
- Dates:
- 1965
Results
Contents
X-Ray Telescope for an Orbiting Solar Observatory, 1965
Summary
- Dates:
- 1965
Catalog description - Drafts, notes and diagrams, 1967-1968
Summary
- Dates:
- 1967-1968
Catalog of OSO-3 Solar X-Ray Observations, 1967-1968
Summary
- Dates:
- 1967-1968
Correlation Studies of Solar X-Ray and Radio Bursts, 1971-1972
Summary
- Dates:
- 1971-1972
Experiment summaries, 1972
Summary
- Dates:
- 1972
Hard Solar X-Ray Spectrum Observed from the Third Orbiting Solar Observatory, 1967
Summary
- Dates:
- 1967
Jupiter - Research materials and draft, 1967-1968
Summary
- Dates:
- 1967-1968
Long Term Temporal Variations of the Hard X-Ray Flux from the Centaurus Region, 1971-1972
Summary
- Dates:
- 1971-1972
Observations of Unsolved Galactic X-Ray Sources, 1970-1971
Summary
- Dates:
- 1970-1971
Preliminary Results of the UC X-Ray Experiment on the OSO-3, 1967
Summary
- Dates:
- 1967
Satellite Observations of the X-Ray Source in Lupus, 1968
Summary
- Dates:
- 1968
Satellite Observations of the X-Ray Source in Lupus - Drafts and notes
Simultaneous X-Ray and Optical Observations of SCO-1 Flares, undated
Summary
- Dates:
- undated
Solar and Cosmic X-Rays Above 7.7 KeV, 1969
Summary
- Dates:
- 1969
Spectrum of Diffuse Cosmic X-Rays and "Isotropy of Diffuse Cosmic X-Rays Determined by OSO-3", 1970
Summary
- Dates:
- 1970
Spectrum of Diffuse Cosmic X-Rays and "Isotropy of Diffuse Cosmic X-Rays Determined by OSO-3", 1970
Summary
- Dates:
- 1970
Spectrum of Diffuse Cosmic X-Rays Observed between 7 and 100 KeV, 1974
Summary
- Dates:
- 1974
Time Structure of Solar X-Ray Bursts Above 7.7 KeV, 1969
Summary
- Dates:
- 1969
UCSD X-Ray Experiment, 1967-1968
Summary
- Dates:
- 1967-1968
Upper Limits to the X-Ray Luminosities of Five Supernovae, 1972
Summary
- Dates:
- 1972
ORBITING SOLAR OBSERVATORY - 7 (OSO-7)
Background
- Scope and content:
-
Series 12) ORBITING SOLAR OBSERVATORY-7 (OSO-7): Documents two UCSD experiments aboard the OSO-7 satellite. The Cosmic X-Ray Experiment detected cosmic sources of x-rays, and the Solar X-ray Experiment detected x-rays from the sun. Arranged in three subseries: A) General, B) Cosmic X-ray Detector, and C) Solar X-ray Detector.
Contents
General
Contents
Planning - Checklist, 1967-1968
Summary
- Dates:
- 1967-1968
Planning - Process standards, 1967-1970
Summary
- Dates:
- 1967-1970
Planning - Magnetics for OSO designers, 1967
Summary
- Dates:
- 1967
Planning - Star tracker and gyro, 1967-1968
Summary
- Dates:
- 1967-1968
Planning - Automatic Data Processing Facility, 1968-1972
Summary
- Dates:
- 1968-1972
Planning - Experiment - Spacecraft interface specification, 1969
Summary
- Dates:
- 1969
Planning - Experiment Interface Specification, 1969
Summary
- Dates:
- 1969
Planning - Experiment Allocation and Performance Summary, 1969
Summary
- Dates:
- 1969
Planning - Processing standard, 1969
Summary
- Dates:
- 1969
Planning - Spacecraft Instrument Interface Document, 1969
Summary
- Dates:
- 1969
Planning - Experimenters Meeting - BBRC, 1970
Summary
- Dates:
- 1970
Planning - Operation checklist, 1970
Summary
- Dates:
- 1970
Planning - Screening Specification, 1970
Summary
- Dates:
- 1970
Planning - Feasibility Study - Quicklook Data Link, 1971
Summary
- Dates:
- 1971
Planning - Feasibility Study - System Expansion, 1971
Summary
- Dates:
- 1971
Planning - Aspect Determination Model, 1971
Summary
- Dates:
- 1971
Planning - NASA Overview, 1971
Summary
- Dates:
- 1971
Planning - Data Processing Plan, 1971
Summary
- Dates:
- 1971
Planning - Project Overview, 1971
Summary
- Dates:
- 1971
Planning - Experiment Mission Operations and Evaluation Plan, 1972
Summary
- Dates:
- 1972
Planning - Contract data requirements list
Planning - Description of fit controls
Correspondence - General, 1971-1974
Summary
- Dates:
- 1971-1974
Correspondence - BBRC, 1967-1970
Summary
- Dates:
- 1967-1970
Correspondence - NASA - GSFC, 1967-1974
Summary
- Dates:
- 1967-1974
Proposals - Augmentation and Interpretation of OSO-7 Hard X-Ray Sky Maps - UCSD 3397, 1971-1973
Summary
- Dates:
- 1971-1973
Proposals - Preparation of a Set of Sky Maps in Hard X-Rays from OSO-7 Data - UCSD 8937, 1976-1977
Summary
- Dates:
- 1976-1977
Proposals - Augmentations and Interpretation of OSO-7 Hard X-Ray Sky Maps - UCSD 3397, 1977
Summary
- Dates:
- 1977
Suppliers and equipment - Gyro requirements, 1966
Summary
- Dates:
- 1966
Suppliers and equipment - Contracts, 1966-1969
Summary
- Dates:
- 1966-1969
Suppliers and equipment - BBRC, 1967-1971
Summary
- Dates:
- 1967-1971
Suppliers and equipment - ADP instrument checkout, 1968
Summary
- Dates:
- 1968
Suppliers and equipment - Contracts, 1969
Summary
- Dates:
- 1969
Suppliers and equipment - SORE requirements
Instrument drawings - Cartridge detector - 5197, 1961
Summary
- Dates:
- 1961
Instrument drawings - Spacer - 7065, 1961
Summary
- Dates:
- 1961
Instrument drawings - Lens plano convex - 18482, 1963
Summary
- Dates:
- 1963
Instrument drawings - Compartments 5 and 6, 1963
Summary
- Dates:
- 1963
Instrument drawings - Wire-Extruded teflon insulation - 9716, 1963
Summary
- Dates:
- 1963
Instrument drawings - Design specification silicon cell assembly - 15903, 1964
Summary
- Dates:
- 1964
Instrument drawings - Filter - 15474, 1964
Summary
- Dates:
- 1964
Instrument drawings - Standard part, 1964
Summary
- Dates:
- 1964
Instrument drawings - Wheel structure assembly, 1964
Summary
- Dates:
- 1964
Instrument drawings - Structure assembly wheel, 1966
Summary
- Dates:
- 1966
Instrument drawings - Strap, pick off - 29811, 1968
Summary
- Dates:
- 1968
Instrument drawings - Enclosure, collimator pre-AMP - 32537, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 32553, 1969
Summary
- Dates:
- 1969
Instrument drawings - Environmental test specification for OSO components and subassemblies - 31800, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32539, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board pre-AMP - 32544, 1969
Summary
- Dates:
- 1969
Instrument drawings - RIM assembly - 32745, 1969
Summary
- Dates:
- 1969
Instrument drawings - Cell assembly - 33391, 1969
Summary
- Dates:
- 1969
Instrument drawings - Cell assembly - 33394, 1969
Summary
- Dates:
- 1969
Instrument drawings - Cell, sensor - 29812, 1969
Summary
- Dates:
- 1969
Instrument drawings - Holder assembly, silicon cell - 33395, 1969
Summary
- Dates:
- 1969
Instrument drawings - Holder, silicon cell - 33398, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 33393, 1969
Summary
- Dates:
- 1969
Instrument drawings - Enclosure, PMT pre-AMP - 32542, 1969
Summary
- Dates:
- 1969
Instrument drawings - End plate - 32503, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 33355, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32558, 1969
Summary
- Dates:
- 1969
Instrument drawings - Cover, collimator pre-AMP - 32540, 1969
Summary
- Dates:
- 1969
Instrument drawings - Cover, PMT and well pre-AMP - 32545, 1969
Summary
- Dates:
- 1969
Instrument drawings - Enclosure - 32574, 1969
Summary
- Dates:
- 1969
Instrument drawings - Filter and shield assembly - 32563, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 33354, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32554, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32556, 1969
Summary
- Dates:
- 1969
Instrument drawings - Selected part drawing photograph, 1969
Summary
- Dates:
- 1969
Instrument drawings - Shield, RFI - 32564, 1969
Summary
- Dates:
- 1969
Instrument drawings - Inductor assembly-toroidal - 32570
Instrument drawings - Insulator - 32565, 1969
Summary
- Dates:
- 1969
Instrument drawings - Insulator - 33367, 1969
Summary
- Dates:
- 1969
Instrument drawings - Shield-corona - 32566, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32560, 1969
Summary
- Dates:
- 1969
Instrument drawings - Schematic diagram - 32568, 1969
Summary
- Dates:
- 1969
Instrument drawings - Aperture - 34306, 1970
Summary
- Dates:
- 1970
Instrument drawings - Base, mounting - 32552, 1970
Summary
- Dates:
- 1970
Instrument drawings - Detector assembly - 34307, 1970
Summary
- Dates:
- 1970
Instrument drawings - Cell assembly, detector - 17315, 1970
Summary
- Dates:
- 1970
Instrument drawings - Housing - 35601, 1970
Summary
- Dates:
- 1970
Instrument drawings - Schematic diagram - 32567, 1970
Summary
- Dates:
- 1970
Instrument drawings - Terminal board - 35603, 1970
Summary
- Dates:
- 1970
Instrument drawings - Inductor assembly-toroidal - 32569, 1970
Summary
- Dates:
- 1970
Instrument drawings - Transformer assembly, toroidal - 32572, 1970
Summary
- Dates:
- 1970
Instrument drawings - Insulator - 36172, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly - 32557, 1970
Summary
- Dates:
- 1970
Instrument drawings - Terminal board - 32562, 1970
Summary
- Dates:
- 1970
Instrument drawings - Collimator assembly - 32536, 1970
Summary
- Dates:
- 1970
Instrument drawings - PMT pre-AMP - 32541, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly, PMT pre-AMP - 32543, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly - 32559, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly - 32561, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly, collimator pre-AMP - 32538, 1970
Summary
- Dates:
- 1970
Instrument drawings - Terminal board assembly - 35602, 1970
Summary
- Dates:
- 1970
Instrument drawings - Transformer assembly, toroidal - 32571, 1970
Summary
- Dates:
- 1970
Instrument drawings - Transformer assembly, toroidal - 32573, 1970
Summary
- Dates:
- 1970
Instrument drawings - Well pre-AMP, electronics assembly - 33353, 1970
Summary
- Dates:
- 1970
Testing and review - Environmental Test Specification, 1963
Summary
- Dates:
- 1963
Testing and review - Experimenter's Manual, 1966-1967
Summary
- Dates:
- 1966-1967
Testing and review - Magnetic field restraints, 1967
Summary
- Dates:
- 1967
Testing and review - Experimenter's Meeting Summary, 1967
Summary
- Dates:
- 1967
Testing and review - Interface Definition Study, 1968
Summary
- Dates:
- 1968
Testing and review - Data Processing Feasibility Study, 1968
Summary
- Dates:
- 1968
Testing and review - Experiment Interface Definition Summary, 1968
Summary
- Dates:
- 1968
Testing and review - Document Change Notices, 1969-1970
Summary
- Dates:
- 1969-1970
Testing and review - Environmental Test Specification, 1969
Summary
- Dates:
- 1969
Testing and review - Experiment Allocation and Performance Summary, 1969
Summary
- Dates:
- 1969
Testing and review - Meeting Minutes for OSO-H Electronics, 1969-1971
Summary
- Dates:
- 1969-1971
Testing and review - Quick look detector testing, 1969
Summary
- Dates:
- 1969
Testing and review - Detail test sheets, 1970
Summary
- Dates:
- 1970
Testing and review - Instrument Test and Operation Specification, 1970
Summary
- Dates:
- 1970
Testing and review - Document Change Notices, 1970 April-September
Summary
- Dates:
- 1970 April-September
Testing and review - Experiment Test Plan, 1970
Summary
- Dates:
- 1970
Testing and review - Document Change Notices, 1970-1971
Summary
- Dates:
- 1970-1971
Testing and review - Temperature profile of scientific instruments, 1970
Summary
- Dates:
- 1970
Testing and review - Data format for experimenter tape, 1971
Summary
- Dates:
- 1971
Testing and review - All systems compatibility test scenario, 1971
Summary
- Dates:
- 1971
Testing and review - Photomultiplier gain and resolution, 1971
Summary
- Dates:
- 1971
Testing and review - Flight Readiness Review, 1971
Summary
- Dates:
- 1971
Testing and review - Final experiment button-up, 1971
Summary
- Dates:
- 1971
Project notebooks - Robert Farnsworth - OSO-H, 1967-1969
Summary
- Dates:
- 1967-1969
Project notebooks - Pat Edwards - Solar Detector, 1969
Summary
- Dates:
- 1969
Project notebooks - Robert Farnsworth - OSO-H, 1970-1971
Summary
- Dates:
- 1970-1971
Data - Reduction instructions, 1970
Summary
- Dates:
- 1970
Data - Quick look, 1970-1971
Summary
- Dates:
- 1970-1971
Data - Computer processing, 1971-1972
Summary
- Dates:
- 1971-1972
Data - Cooperations, 1971-1974
Summary
- Dates:
- 1971-1974
Data - Data reduction scheduling, 1971-1972
Summary
- Dates:
- 1971-1972
Data - Attitude, 1972-1973
Summary
- Dates:
- 1972-1973
Data - Orbit data, 1973
Summary
- Dates:
- 1973
Results - "Brehmsstrahlung Component of the Diffuse Galactic Gamma-Ray Emissions at MeV...", 1984
Summary
- Dates:
- 1984
Results - Drafts of papers, 1971-1974
Summary
- Dates:
- 1971-1974
Results - "Gamma-Ray Astronomy", 1982
Summary
- Dates:
- 1982
Results - GSFC directives, 1970-1973
Summary
- Dates:
- 1970-1973
Results - Publications list, 1971-1972
Summary
- Dates:
- 1971-1972
Cosmic X-ray Detector
Contents
Planning - Request for proposal, 1967
Summary
- Dates:
- 1967
Planning - NASA 533 forms and recaps, 1967-1974
Summary
- Dates:
- 1967-1974
Planning - Specifications for telescope, 1968
Summary
- Dates:
- 1968
Planning - Product Assurance Plan, 1969
Summary
- Dates:
- 1969
Planning - Quality control, 1969
Summary
- Dates:
- 1969
Planning - Interface documentation, 1969
Summary
- Dates:
- 1969
Planning - Design and Performance Specification, 1969
Summary
- Dates:
- 1969
Planning - Flight instrument tester 1, 1969
Summary
- Dates:
- 1969
Planning - General scheduling, 1970
Summary
- Dates:
- 1970
Planning - Instrument description and manual, 1970
Summary
- Dates:
- 1970
Planning - Cosmic Experiment Schedule Meeting, 1970-1971
Summary
- Dates:
- 1970-1971
Planning - Qualification Test Plan, 1970
Summary
- Dates:
- 1970
Planning - Cosmic Acceptance Test Plan, 1971
Summary
- Dates:
- 1971
Planning - List of descriptions and a diagram of the detector model, undated
Summary
- Dates:
- undated
Planning - Materials and process list, undated
Summary
- Dates:
- undated
Planning - Phase 1 schedule and budget, undated
Summary
- Dates:
- undated
Planning - Proposal evaluation, undated
Summary
- Dates:
- undated
Correspondence - BBRC, 1967-1968
Summary
- Dates:
- 1967-1968
Correspondence - BBRC subcontract, 1968-1970
Summary
- Dates:
- 1968-1970
Correspondence - BBRC, 1969-1971
Summary
- Dates:
- 1969-1971
Correspondence - Cosmic contract, 1972-1975
Summary
- Dates:
- 1972-1975
Correspondence - Data reduction - Cosmic Proposal, 1973-1975
Summary
- Dates:
- 1973-1975
Correspondence - General, 1970
Summary
- Dates:
- 1970
Correspondence - NASA - GSFC, 1962-1969
Summary
- Dates:
- 1962-1969
Correspondence - NASA, 1967-1970
Summary
- Dates:
- 1967-1970
Proposals - Cosmic X-Ray Instrument for OSO-H - UCSD 1929, 1967
Summary
- Dates:
- 1967
Proposals - Data Reduction and Analysis of the UCSD Cosmic X-Ray Experiment on OSO-H - UCSD 3387, 1967-1970
Summary
- Dates:
- 1967-1970
Proposals - Cosmic X-Ray Instrument for OSO-H, 1967-1968
Summary
- Dates:
- 1967-1968
Proposals - Contracts, 1967-1971
Summary
- Dates:
- 1967-1971
Proposals - Cosmic X-Ray Instrument for OSO-H - UCSD 2409, 1968
Summary
- Dates:
- 1968
Proposals - Cosmic X-Ray Instrument for OSO-H - UCSD 3387, 1970
Summary
- Dates:
- 1970
Proposals - Cosmic X-Ray Instrument for OSO-H - UCSD 3595, 1970
Summary
- Dates:
- 1970
Proposals - Cosmic X-Ray Instrument for OSO-H - UCSD 3912, 1970
Summary
- Dates:
- 1970
Proposals - Cosmic X-Ray Instrument for OSO-H - UCSD 4168, 1971
Summary
- Dates:
- 1971
Proposals - Cosmic X-Ray Instrument for OSO-H - UCSD 4422, 1971
Summary
- Dates:
- 1971
Proposals - Hardware development overrun - UCSD 4871, 1971
Summary
- Dates:
- 1971
Proposals - Attitude program, 1971
Summary
- Dates:
- 1971
Proposals - Miscellaneous, 1971-1974
Summary
- Dates:
- 1971-1974
Proposals - Final Reduction and Analysis of Data - UCSD 5944, 1973
Summary
- Dates:
- 1973
Proposals - Final Reduction and Analysis of Data from UCSD Cosmic X-Ray Experiment on OSO-7 - UCSD 5974, 1973
Summary
- Dates:
- 1973
Proposals - Extension Reduction and Analysis of Data from UCSD Cosmic X-Ray Experiment on OSO-7 - UCSD 6187, 1973
Summary
- Dates:
- 1973
Proposals - Analysis of Data from UCSD Cosmic X-Ray Telescope on OSO-7 - UCSD 6741, 1974-1975
Summary
- Dates:
- 1974-1975
Proposals - Analysis and Interpretation of Cosmic X-Ray Data from OSO-7 - UCSD 7944, 1975-1976
Summary
- Dates:
- 1975-1976
Suppliers and equipment - Ball Brothers cosmic x-ray instrument, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Marshall Laboratories proposal, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Request for proposals, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Star sensor, 1967-1968
Summary
- Dates:
- 1967-1968
Suppliers and equipment - Ball Brothers addendum proposal, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Analog Technology Corporation proposal, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Configuration item specification, 1970
Summary
- Dates:
- 1970
Suppliers and equipment - Engineering orders, 1970
Summary
- Dates:
- 1970
Suppliers and equipment - Analog Technology Corporation proposal vol. 2-3, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Cost proposal, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Contracts correspondence, 1967-1968
Summary
- Dates:
- 1967-1968
Suppliers and equipment - Electro-Optical Systems, INC proposal, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Marshall Laboratories proposal revised, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Product assurance requirements, 1968
Summary
- Dates:
- 1968
Suppliers and equipment - Electro-Mechanical Research, INC 3" PMT 50-1009, 1968-1970
Summary
- Dates:
- 1968-1970
Suppliers and equipment - Shield crystals, 1968
Summary
- Dates:
- 1968
Suppliers and equipment - BBRC progress reports, 1968-1971
Summary
- Dates:
- 1968-1971
Suppliers and equipment - BBRC subcontract, 1968-1974
Summary
- Dates:
- 1968-1974
Suppliers and equipment - Electronic subsystem, 1969
Summary
- Dates:
- 1969
Suppliers and equipment - Cell assembly procedure, 1969
Summary
- Dates:
- 1969
Suppliers and equipment - Parts review and list, 1969-1970
Summary
- Dates:
- 1969-1970
Suppliers and equipment - Computer system, 1969-1976
Summary
- Dates:
- 1969-1976
Suppliers and equipment - Flight instrument tester 2, 1969
Summary
- Dates:
- 1969
Suppliers and equipment - Parts list, 1969
Summary
- Dates:
- 1969
Suppliers and equipment - Engineering orders, 1969-1970
Summary
- Dates:
- 1969-1970
Suppliers and equipment - Configuration identification list, 1969-1970
Summary
- Dates:
- 1969-1970
Suppliers and equipment - Acceptance test specifications, 1970
Summary
- Dates:
- 1970
Suppliers and equipment - Parts list, 1970
Summary
- Dates:
- 1970
Suppliers and equipment - Materials and processes list
Instrument drawings - Electrical interface control drawing - 24607, 1967
Summary
- Dates:
- 1967
Instrument drawings - Observatory functional drawing, 1967
Summary
- Dates:
- 1967
Instrument drawings - CsI (Na) crystal, 1968
Summary
- Dates:
- 1968
Instrument drawings - Drawing list, 1968
Summary
- Dates:
- 1968
Instrument drawings - Schematic diagram - 32528, 1969
Summary
- Dates:
- 1969
Instrument drawings - Schematic diagram - 32530, 1969
Summary
- Dates:
- 1969
Instrument drawings - End enclosure - 32548, 1969
Summary
- Dates:
- 1969
Instrument drawings - UCSD, solar x-ray compartment 8, OSO-H - 31504, 1969
Summary
- Dates:
- 1969
Instrument drawings - Layout experiment installation - 31601, 1969
Summary
- Dates:
- 1969
Instrument drawings - Cover, electronic assembly cosmic x-ray - 32505, 1969
Summary
- Dates:
- 1969
Instrument drawings - Frame - 32504, 1969
Summary
- Dates:
- 1969
Instrument drawings - Side plate - 32502, 1969
Summary
- Dates:
- 1969
Instrument drawings - Schematic diagram - 32526, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 32506, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 32508, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 32510, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 32512, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 32514, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32507, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32509, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32511, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32513, 1969
Summary
- Dates:
- 1969
Instrument drawings - UCSD, cosmic x-ray compartment 5 and 6, OSO-H - 31508, 1969
Summary
- Dates:
- 1969
Instrument drawings - Connector pattern - 33892, 1969
Summary
- Dates:
- 1969
Instrument drawings - Enclosure assembly, cosmic x-ray electronics - 32501, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 33356, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 33359, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring assembly - 33362, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32521, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32525, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 33357, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 33360, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 33363, 1969
Summary
- Dates:
- 1969
Instrument drawings - Schematic diagram - 33358, 1969
Summary
- Dates:
- 1969
Instrument drawings - Functional diagram, cosmic x-ray electronics - 32535, 1969
Summary
- Dates:
- 1969
Instrument drawings - Assembly, pwr cond unit-cosmic x-ray - 32546, 1969
Summary
- Dates:
- 1969
Instrument drawings - Electronics assembly, cosmic x-ray - 32500, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32515, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32517, 1969
Summary
- Dates:
- 1969
Instrument drawings - Schematic diagram - 32527, 1969
Summary
- Dates:
- 1969
Instrument drawings - Terminal board assembly - 33361, 1969
Summary
- Dates:
- 1969
Instrument drawings - Printed wiring board - 32523, 1970
Summary
- Dates:
- 1970
Instrument drawings - Schematic diagram - 32529, 1970
Summary
- Dates:
- 1970
Instrument drawings - Inductor assembly, toroidal - 33365, 1970
Summary
- Dates:
- 1970
Instrument drawings - Inductor assembly, toroidal - 33366, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly - 32524, 1970
Summary
- Dates:
- 1970
Instrument drawings - Schematic diagram - 32531, 1970
Summary
- Dates:
- 1970
Instrument drawings - Cover - 32550, 1970
Summary
- Dates:
- 1970
Instrument drawings - Cover, pwr cond unit - 32549, 1970
Summary
- Dates:
- 1970
Instrument drawings - Enclosure, HV terminals - 32551, 1970
Summary
- Dates:
- 1970
Instrument drawings - Enclosure - 32547, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly, board A6 - 32516, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly - 32520, 1970
Summary
- Dates:
- 1970
Instrument drawings - Schematic diagram - 32532, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly - 32518, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring assembly - 32522, 1970
Summary
- Dates:
- 1970
Instrument drawings - Printed wiring board - 32519, 1970
Summary
- Dates:
- 1970
Instrument drawings - Schematic diagram - 32533, 1970
Summary
- Dates:
- 1970
Instrument drawings - Schematic diagram - 32534, 1970
Summary
- Dates:
- 1970
Instrument drawings - Wire harness assembly - 37112, 1970
Summary
- Dates:
- 1970
Instrument drawings - Electrical interface control, 1971
Summary
- Dates:
- 1971
Testing and review - Progress Reports, 1968
Summary
- Dates:
- 1968
Testing and review - Monthly Progress Reports, 1968-1969
Summary
- Dates:
- 1968-1969
Testing and review - Weld and heat treat housing, 1969
Summary
- Dates:
- 1969
Testing and review - Progress Reports, 1969
Summary
- Dates:
- 1969
Testing and review - Electronic Subsystem Stress Analysis, 1969
Summary
- Dates:
- 1969
Testing and review - Configuration Item Specifications, 1969
Summary
- Dates:
- 1969
Testing and review - Incoming parts inspection and review, 1970
Summary
- Dates:
- 1970
Testing and review - Progress Reports, 1970-1971
Summary
- Dates:
- 1970-1971
Testing and review - Test procedure target detector assembly, 1970
Summary
- Dates:
- 1970
Testing and review - Vibration testing, 1970
Summary
- Dates:
- 1970
Testing and review - Experiment Test Plan, 1970
Summary
- Dates:
- 1970
Testing and review - Functional test procedures, 1970
Summary
- Dates:
- 1970
Testing and review - Qualification Test Report, 1971
Summary
- Dates:
- 1971
Testing and review - Test and Operation Specification, 1971
Summary
- Dates:
- 1971
Testing and review - Thermal Vacuum Test Report, 1971
Summary
- Dates:
- 1971
Testing and review - Testing data on RCA type C31012 photomultipliers, 1971
Summary
- Dates:
- 1971
Testing and review - Monthly Progress Reports, 1971-1975
Summary
- Dates:
- 1971-1975
Testing and review - Calibration record, undated
Summary
- Dates:
- undated
Testing and review - Cosmic experiment turn-on procedure, undated
Summary
- Dates:
- undated
Testing and review - Flight Readiness Report, undated
Summary
- Dates:
- undated
Project notebooks - A. Jacobson, Volume 1-2, 1967-1969
Summary
- Dates:
- 1967-1969
Project notebooks - R. Smith, Potting and sealing 1, 1968-1971
Summary
- Dates:
- 1968-1971
Project notebooks - Volume 4, 1969
Summary
- Dates:
- 1969
Project notebooks - John Laros, Volume 5, 1969-1972
Summary
- Dates:
- 1969-1972
Project notebooks - Edwin Hutchins, OSO-H cosmic experiment - Volume 1, 1970
Summary
- Dates:
- 1970
Project notebooks - Edwin Hutchins, 1 1/2" photomultiplier tube log, 1970
Summary
- Dates:
- 1970
Project notebooks - Edwin Hutchins, Photomultiplier tube and scintillation crystal testing, 1971
Summary
- Dates:
- 1971
Photographs - Detector engineering model - Detector Assembly, 1968-1969
Summary
- Dates:
- 1968-1969
Photographs - Detector engineering model - AL - ZN alloy castings, 1968
Summary
- Dates:
- 1968
Photographs - Detector engineering model - Well crystal housing - Heavy assembly, 1968
Summary
- Dates:
- 1968
Photographs - Detector engineering model - Collimator crystal housing heavy wall assembly, 1968
Summary
- Dates:
- 1968
Photographs - Detector engineering model - Collimator crystal housing with flat plate, 1968
Summary
- Dates:
- 1968
Photographs - Detector engineering model - Fixtures, 1968
Summary
- Dates:
- 1968
Photographs - Detector engineering model - Dummy collimator crystal and NE102 insert, 1968
Summary
- Dates:
- 1968
Photographs - Detector engineering model - Partially assembled detector housing, 1968
Summary
- Dates:
- 1968
Photographs - Detector engineering model - Well crystal CsI(Na) and collimator crystal CsI(Na), 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Crystal detector S-N DM 830, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - 3" PMT face broken, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Aluminum alloy forging for collimator housing, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Central detector and detector PMT, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Well housing (Pre-heat treat and weld), 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Central PMT with bleeder string, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Well housing, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - 1 1/2" PMT assembly - RCA (1032) - Fixture prototype, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Well crystal housing with silicone rubber tape - Air bleed fitting, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Fixtures, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Pieces that make up central detector assembly with foil conetic, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Crystal separator ring and beryllium window, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Well separator and collimator separator, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Well housing and pre-heated weld (1041), 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Collimator housing and 1 1/2" PMT housing, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Data 622 - I computer system with ASR 35 teletype, 1969
Summary
- Dates:
- 1969
Photographs - Detector engineering model - Central detector (1049), undated
Summary
- Dates:
- undated
Photographs - Detector engineering model - Collimator crystal, undated
Summary
- Dates:
- undated
Photographs - Detector engineering model - Pulse height analyzer, undated
Summary
- Dates:
- undated
Photographs - Detector engineering model - Well housing made on a milling machine (1059), undated
Summary
- Dates:
- undated
Photographs - Detector engineering model - 1 1/2" PMT, undated
Summary
- Dates:
- undated
Photographs - Detector engineering model - Playback system, undated
Summary
- Dates:
- undated
Photographs - Detector engineering model - BBRC - Color and black and white prints, undated
Summary
- Dates:
- undated
Photographs - Detector prototype - Dry box, 1969
Summary
- Dates:
- 1969
Photographs - Detector prototype - Detector mounted in balloon gondola AL frame, 1969
Summary
- Dates:
- 1969
Photographs - Detector prototype - Collimator housing in 6 views, 1969
Summary
- Dates:
- 1969
Photographs - Detector prototype - Detector completely assembled on base plate dummy crystals, 1970
Summary
- Dates:
- 1970
Photographs - Detector prototype - Central detector NaI(TI), 1970
Summary
- Dates:
- 1970
Photographs - Detector prototype - Crystals and center detectors in drybox, 1970
Summary
- Dates:
- 1970
Photographs - Detector prototype - Well crystal interior and exterior, 1970
Summary
- Dates:
- 1970
Photographs - Detector prototype - Collimator crystal interior and exterior, 1970
Summary
- Dates:
- 1970
Photographs - Detector prototype - 3" PMT - Temporary mounted testing, 1970
Summary
- Dates:
- 1970
Photographs - Detector prototype - 1 1/2" PMT - All parts ready to assemble, 1970
Summary
- Dates:
- 1970
Photographs - Detector prototype - Potting experiment, 1970
Summary
- Dates:
- 1970
Photographs - Detector prototype - Physicist Baity testing detector with oscillators and GSE, 1969
Summary
- Dates:
- 1969
Photographs - Detector prototype - Setup for thermal vaccum, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Well housing before welding 1 1/2" PMT housings, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - 1 1/2" PMT housings, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Well housing and two 1 1/2" PMT housings, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Fixtures for well housing, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Stiffeners for well housing, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Jess making well housing, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Collimator housing, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Collimator and well assembly prototype, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Central detector 1101, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Central detector 1104 (DY660), 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Collimator housing exterior and interior, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Collimator separator, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Complete detector assembly on baseplate, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Prototype detector vibration test, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Collimator housing 1128-1133, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Well and collimator housings, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Well separator and collimator separator, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - 1 1/2" PMT with new bleeder string as received from RCA, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Optical potting fixture for 1 1/2" PMT, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Cap for 1 1/2" PMT bleeder string, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Housing for 3" PMT, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Fixtures for potting 3" PMT bleeder string, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Base plate, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Brackets and 1 1/2" PMT cap, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Detector for acoustical test, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - GSE flight instrument tester 2 and flight instrument, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Detector test equipment, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Flight unit gain callibration test set up, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Simulation flight for the prototype, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Radioactive source holder and optical alignment, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - 1 1/2" PMT optical assembly with housing cap, 1970
Summary
- Dates:
- 1970
Photographs - Detector flight model - Detector completely assembled, 1971
Summary
- Dates:
- 1971
Photographs - Detector flight model - 3" PMT housing and central detector assembly, 1971
Summary
- Dates:
- 1971
Photographs - Detector flight model - Small overview, undated
Summary
- Dates:
- undated
Photographs - Detector flight model - Large overview, undated
Summary
- Dates:
- undated
Data - Data reduction, 1970-1974
Summary
- Dates:
- 1970-1974
Data - Production data, 1972
Summary
- Dates:
- 1972
Results - Final Report, 1975
Summary
- Dates:
- 1975
Solar X-ray Detector
Contents
Planning - Request for proposal, 1966-1967
Summary
- Dates:
- 1966-1967
Planning - Statement of Work, 1966
Summary
- Dates:
- 1966
Planning - Quality Assurance Manual, 1966
Summary
- Dates:
- 1966
Planning - Phase 1 schedule and budget, 1967
Summary
- Dates:
- 1967
Planning - Statement of Work, 1967
Summary
- Dates:
- 1967
Planning - NASA phase 1 contracts, 1967-1968
Summary
- Dates:
- 1967-1968
Planning - NASA 533 forms and recaps, 1967-1975
Summary
- Dates:
- 1967-1975
Planning - Request for proposal, 1967
Summary
- Dates:
- 1967
Planning - Preliminary design, 1967
Summary
- Dates:
- 1967
Planning - Research materials, 1967-1974
Summary
- Dates:
- 1967-1974
Planning - Miscellaneous notes, 1968-1971
Summary
- Dates:
- 1968-1971
Planning - Product Assurance Plan, 1968
Summary
- Dates:
- 1968
Planning - Solar instrument description, 1970
Summary
- Dates:
- 1970
Planning - Design and drafting standards, 1970
Summary
- Dates:
- 1970
Planning - Design specifications, 1970-1971
Summary
- Dates:
- 1970-1971
Planning - Drawing list, 1971
Summary
- Dates:
- 1971
Planning - Functional specifications, 1971
Summary
- Dates:
- 1971
Planning - Data Submission Plan, 1971
Summary
- Dates:
- 1971
Planning - Research materials, 1971
Summary
- Dates:
- 1971
Planning - Experiment turn-on procedures, undated
Summary
- Dates:
- undated
Correspondence - Analog Technology Corporation (ATC) subcontract, 1966-1971
Summary
- Dates:
- 1966-1971
Correspondence - ATC, 1967-1968, 1070-1972
Summary
- Dates:
- 1967-1968, 1070-1972
Correspondence - BBRC, 1969-1970
Summary
- Dates:
- 1969-1970
Correspondence - General, 1967
Summary
- Dates:
- 1967
Correspondence - NASA - GSFC, 1967-1970
Summary
- Dates:
- 1967-1970
Correspondence - UCSD, 1967-1970
Summary
- Dates:
- 1967-1970
Proposals - Hard Solar X-Ray and Radiation Monitoring Experiment - UCSD 1843, 1966
Summary
- Dates:
- 1966
Proposals - Project Change and Extension, 1966-1970
Summary
- Dates:
- 1966-1970
Proposals - Solar Flare X-Ray Instrument - UCSD 1855, 1966-1967
Summary
- Dates:
- 1966-1967
Proposals - Hard Solar X-Ray Radiation Monitoring Instrument - UCSD 4169, 1967
Summary
- Dates:
- 1967
Proposals - Hard Solar X-Ray Radiation Monitoring Instrument - UCSD 1843, 1967
Summary
- Dates:
- 1967
Proposals - Hard Solar X-Ray Radiation Monitoring Instrument - UCSD 2314, 1967
Summary
- Dates:
- 1967
Proposals - Hard Solar X-Ray Radiation Monitoring Instrument - UCSD 2326, 1967
Summary
- Dates:
- 1967
Proposals - Hard Solar X-Ray Radiation Monitoring Instrument - UCSD 2314, 1967
Summary
- Dates:
- 1967
Proposals - Radiation Monitoring Instrument for OSO-H - UCSD 2314, 1967
Summary
- Dates:
- 1967
Proposals - NASA contract awards, 1968-1972
Summary
- Dates:
- 1968-1972
Proposals - Hard Solar X-Ray Monitoring Instrument for OSO-H - UCSD 3596, 1970
Summary
- Dates:
- 1970
Proposals - Radiation Monitoring Instrument for OSO-H - UCSD 3388, 1970
Summary
- Dates:
- 1970
Proposals - Hard Solar X-Ray Radiation Monitoring Instrument for OSO-H - UCSD 3913 (contract pricing proposals), 1970
Summary
- Dates:
- 1970
Proposals - Hard Solar X-Ray Radiation Monitoring Instrument for OSO-H - UCSD 4423, 1971
Summary
- Dates:
- 1971
Proposals - Hardware Development Overrun and Launch Extension - UCSD 4872, 1972
Summary
- Dates:
- 1972
Proposals - Correlation of Solar X-Ray Burst with Optical, Radio, and Energetic Particle Phenomena, 1973
Summary
- Dates:
- 1973
Proposals - Correlation of Solar X-Ray Burst with Optical, Radio, and Energetic Particle Phenomena - UCSD 6294, 1973-1974
Summary
- Dates:
- 1973-1974
Proposals - Extension of Reduction and Analysis of Data from UCSD Solar X-Ray Experiment on OSO-7 - UCSD 6273, 1973-1974
Summary
- Dates:
- 1973-1974
Proposals - Correlation of Solar X-Ray Data with Optical, Radio, and Energetic Particle Phenomena - UCSD 7148, 1974-1975
Summary
- Dates:
- 1974-1975
Proposals - Extension of Analysis of the Data from the UCSD Solar X-Ray Experiment on OSO-7 - UCSD 6892, 1974-1975
Summary
- Dates:
- 1974-1975
Proposals - NASA-Solar contract, 1975
Summary
- Dates:
- 1975
Proposals - Analysis and Interpretation of Solar X-Ray Data from OSO-7 - UCSD 7803 Revised, 1975-1976
Summary
- Dates:
- 1975-1976
Proposals - Analytical and Experimental Studies of Solar Flare X-Ray Phenomena - UCSD 8776, 1976-1977
Summary
- Dates:
- 1976-1977
Proposals - Analytical and Experimental Studies of Solar Flare X-Ray Phenomena - UCSD 8776R2, 1976-1977
Summary
- Dates:
- 1976-1977
Proposals - Analytical and Experimental Studies of Solar Flare X-Ray Phenomena - UCSD 10101, 1977
Summary
- Dates:
- 1977
Proposals - Analytical and Experimental Studies of Solar Flare X-Ray Phenomena - UCSD 3870, 1978
Summary
- Dates:
- 1978
Proposals - Analytical and Experimental Studies of Solar Flare X-Ray Phenomena - UCSD 4939, 1979
Summary
- Dates:
- 1979
Suppliers and equipment - Marshall Laboratories monitoring package, 1966
Summary
- Dates:
- 1966
Suppliers and equipment - ATC monitoring package, 1966
Summary
- Dates:
- 1966
Suppliers and equipment - BBRC solar radiation monitor experiment, 1966
Summary
- Dates:
- 1966
Suppliers and equipment - ATC request for quotation, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - ATC subcontract, 1967-1969
Summary
- Dates:
- 1967-1969
Suppliers and equipment - ATC preliminary design, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - Electro-Optical Systems, INC proposal, 1967
Summary
- Dates:
- 1967
Suppliers and equipment - ATC contract, 1968-1971
Summary
- Dates:
- 1968-1971
Suppliers and equipment - NASA contracts, 1968-1978
Summary
- Dates:
- 1968-1978
Suppliers and equipment - ATC subcontract - Meeting, 1968-1970
Summary
- Dates:
- 1968-1970
Suppliers and equipment - ATC subcontract - Instrument specifications, 1968-1971
Summary
- Dates:
- 1968-1971
Suppliers and equipment - Amelco semiconductor, 1968
Summary
- Dates:
- 1968
Suppliers and equipment - ATC change proposals, 1968-1971
Summary
- Dates:
- 1968-1971
Suppliers and equipment - ATC contract changes, 1969
Summary
- Dates:
- 1969
Suppliers and equipment - ATC - Correspondence, 1969
Summary
- Dates:
- 1969
Suppliers and equipment - Receiving reports, 1969-1973
Summary
- Dates:
- 1969-1973
Suppliers and equipment - ATC component summary list, 1970
Summary
- Dates:
- 1970
Suppliers and equipment - Photomultiplier tube, 1970-1971
Summary
- Dates:
- 1970-1971
Suppliers and equipment - ATC - Correspondence, 1970
Summary
- Dates:
- 1970
Suppliers and equipment - ATC component parts program vol. 1-2, 1970
Summary
- Dates:
- 1970
Suppliers and equipment - ATC prototype acceptance test report, 1971
Summary
- Dates:
- 1971
Suppliers and equipment - ATC instrument description, 1971
Summary
- Dates:
- 1971
Instrument drawings - Observatory functional drawing, 1967
Summary
- Dates:
- 1967
Instrument drawings - Hard x-ray detector, 1968
Summary
- Dates:
- 1968
Instrument drawings - PERT, 1968-1969
Summary
- Dates:
- 1968-1969
Instrument drawings - Compartment 8, 1969
Summary
- Dates:
- 1969
Instrument drawings - Wiring diagram - 1106008, 1969
Summary
- Dates:
- 1969
Instrument drawings - Low power accumulator, 1970
Summary
- Dates:
- 1970
Instrument drawings - Hole locator - 1096300, 1970
Summary
- Dates:
- 1970
Instrument drawings - ALIN 4 line driver - 1065740, 1970
Summary
- Dates:
- 1970
Instrument drawings - AVSR2 - 1065730, 1970
Summary
- Dates:
- 1970
Instrument drawings - Rear connector panel - 1065720, 1970
Summary
- Dates:
- 1970
Instrument drawings - Flight instrument tester - 1065710, 1970
Summary
- Dates:
- 1970
Instrument drawings - Instrument word select - 1065780, 1970
Summary
- Dates:
- 1970
Instrument drawings - Sungate - 1065772, 1970
Summary
- Dates:
- 1970
Instrument drawings - Binary to decimal converter - 1065760, 1970
Summary
- Dates:
- 1970
Instrument drawings - AVMO5 decoder - 1065750, 1971
Summary
- Dates:
- 1971
Instrument drawings - Test connector adapter cable - 1065791, 1971
Summary
- Dates:
- 1971
Instrument drawings - Electrical interface control, 1971
Summary
- Dates:
- 1971
Instrument drawings - Azimuth test stand drawing list
Testing and review - BBRC Solar Radiation Monitor Experiment, 1966
Summary
- Dates:
- 1966
Testing and review - Radiation Monitoring Instrument Experiment, 1968
Summary
- Dates:
- 1968
Testing and review - Monthly Progress Reports, 1968-1971
Summary
- Dates:
- 1968-1971
Testing and review - Progress Reports, 1968-1969
Summary
- Dates:
- 1968-1969
Testing and review - Equipment Testing Notebook, 1970-1971
Summary
- Dates:
- 1970-1971
Testing and review - Test procedures, 1970
Summary
- Dates:
- 1970
Testing and review - Progress Reports, 1970-1971
Summary
- Dates:
- 1970-1971
Testing and review - Interface Compliance Test Report, 1971
Summary
- Dates:
- 1971
Testing and review - Test and Operation specification, 1971
Summary
- Dates:
- 1971
Testing and review - Vibration and Acceleration Test Report, 1971
Summary
- Dates:
- 1971
Testing and review - Flight Readiness Report, 1971
Summary
- Dates:
- 1971
Testing and review - Instrument Flight Spare Acceptance Test Report, 1971
Summary
- Dates:
- 1971
Testing and review - Progress Reports, 1972-1973
Summary
- Dates:
- 1972-1973
Testing and review - Quarterly Status Reports, 1973-1975
Summary
- Dates:
- 1973-1975
Testing and review - Progress Reports, 1974-1975
Summary
- Dates:
- 1974-1975
Solar detector project notebooks, 1967-1969
Summary
- Dates:
- 1967-1969
Solar detector project notebooks - David McKenzie, 1969-1971
Summary
- Dates:
- 1969-1971
Photographs - Solar x-ray instrument, 1970
Summary
- Dates:
- 1970
Photographs - McKenzie paper, 1971
Summary
- Dates:
- 1971
Data - Format, 1967
Summary
- Dates:
- 1967
Data - Solar data package - Parts 1-2, 1968-1969
Summary
- Dates:
- 1968-1969
Data - Particle radiation monitoring detectors, instructions for data analysis, 1971
Summary
- Dates:
- 1971
Data - Observations - Volumes 1-2, 1971-1972
Summary
- Dates:
- 1971-1972
Data - Tape catalogs, 1971
Summary
- Dates:
- 1971
Data - Solar tapes data catalog - 9100 - 2 - 3600's concatenated, 1971-1973
Summary
- Dates:
- 1971-1973
Data - Solar tapes data catalog - 3600 production, 1971-1973
Summary
- Dates:
- 1971-1973
Data - Solar tapes data catalog - 3200 quick look, 1971-1973
Summary
- Dates:
- 1971-1973
Data - HX plots - Notebook 1 - Day 11 - day 112, 1973
Summary
- Dates:
- 1973
Data - HX plots - Notebook 1 - Day 11 - day 301, 1973
Summary
- Dates:
- 1973
Data - Data reduction, 1972-1976
Summary
- Dates:
- 1972-1976
Data - HX plots - Notebook 1 - Day 49 - day 262, 1972
Summary
- Dates:
- 1972
Data - HX plots - Notebook 1 - Day 298 - day 308, 1972
Summary
- Dates:
- 1972
Data - HX plots - Notebook 2 - Day 66 - day 300, 1972
Summary
- Dates:
- 1972
Data - HX plots - Notebook 2 - Day 67 - day 90, 1972
Summary
- Dates:
- 1972
Data - HX plots - Notebook 2 - Day 67 - day 155, 1972
Summary
- Dates:
- 1972
Data - HX plots - Notebook 2 - Day 290, 1972
Summary
- Dates:
- 1972
Data - Charts, 1972
Summary
- Dates:
- 1972
Data - Observations, 1972 January 7-February 29
Summary
- Dates:
- 1972 January 7-February 29
Data - Observations, 1972 March 1-April 15
Summary
- Dates:
- 1972 March 1-April 15
Data - Observations, 1972 April 16-June 5
Summary
- Dates:
- 1972 April 16-June 5
Data - Released data, 1972
Summary
- Dates:
- 1972
Data - Observations, 1972 June 6-July 31
Summary
- Dates:
- 1972 June 6-July 31
Data - Observations, 1972 August 1-September 30
Summary
- Dates:
- 1972 August 1-September 30
Data - Observations, 1972 October 1-November 15
Summary
- Dates:
- 1972 October 1-November 15
Data - Observations, 1972 November 16-December 31
Summary
- Dates:
- 1972 November 16-December 31
Data - Observations, 1973 January 1-February 15
Summary
- Dates:
- 1973 January 1-February 15
Data - Observations, 1973 February 16-May 18
Summary
- Dates:
- 1973 February 16-May 18
Data - Data analysis, 1973-1976
Summary
- Dates:
- 1973-1976
Results - Bibliography with abstracts, 1971-1973
Summary
- Dates:
- 1971-1973
Results - "Non-Thermal Processes in Large Solar Flares", 1976
Summary
- Dates:
- 1976
Results - "UCSD Solar X-Ray Experiment of the Satellite OSO-7", undated
Summary
- Dates:
- undated
SCIENTIFIC BALLOONING
Background
- Scope and content:
-
Series 13) SCIENTIFIC BALLOONING: Documents the many high altitude ballooning flights performed by HEAG in order to prove that an instrument concept will work in an orbital environment. Arranged in nine subseries: A) Planning, B) Correspondence, C) Proposals, D) Suppliers and Equipment, E) Instrument Drawings, F) Testing and Review, G) Flights, H) Data, and I) Results.
Contents
Planning
Contents
Federal Aviation Agency regulations, 1963-1968
Summary
- Dates:
- 1963-1968
G. T. Schjedahl Company, 1965-1966
Summary
- Dates:
- 1965-1966
Winzen Research, 1965-1976
Summary
- Dates:
- 1965-1976
NCAR Advisory Panel Meetings, 1972
Summary
- Dates:
- 1972
University Corporation of Atmospheric Research (UCAR) - National Center for Atmospheric Research (NCAR) budget committee, 1972-1974
Summary
- Dates:
- 1972-1974
UCAR-NCAR - Budget Committee Meeting Minutes
UCAR Board of Trustees Meeting, 1972
Summary
- Dates:
- 1972
UCAR-NCAR - Budget, 1973
Summary
- Dates:
- 1973
UCAR-NCAR - Budget Committee Meeting Minutes, 1973
Summary
- Dates:
- 1973
NCAR flight operations, 1975
Summary
- Dates:
- 1975
UCAR-NCAR - Long duration flight reports, 1978
Summary
- Dates:
- 1978
UCAR-NCAR reports, 1978
Summary
- Dates:
- 1978
UCAR-NCAR - Review Panel, 1978
Summary
- Dates:
- 1978
Expenditures comparison - GRSE/HEAO/Ballooning, 1981
Summary
- Dates:
- 1981
Program Overview, 1993
Summary
- Dates:
- 1993
Correspondence
Contents
Aerospace America, 1991
Summary
- Dates:
- 1991
General, 1976-1983
Summary
- Dates:
- 1976-1983
NCAR, 1964-1976
Summary
- Dates:
- 1964-1976
UCAR booklets, 1978
Summary
- Dates:
- 1978
Proposals
Contents
Infrared X-Ray and Gamma-Ray Astronomy Research, 1962-1975
Summary
- Dates:
- 1962-1975
X-Ray and Gamma-Ray Astronomy Experiments - UCSD 1203, 1963
Summary
- Dates:
- 1963
Hard X-Ray Photometric and Imaging Observations of Cosmic X-Ray Sources, 1969-1976
Summary
- Dates:
- 1969-1976
Studies for X-Ray and Gamma-Ray Astronomy - UCSD 1391, 1964
Summary
- Dates:
- 1964
Logistics Support for Experiments in X-Ray and Gamma-Ray Astronomy - UCSD 1393, 1964
Summary
- Dates:
- 1964
Studies for X-Ray, Gamma-Ray, and Infrared Astronomy - UCSD 1641, 1965
Summary
- Dates:
- 1965
Balloon Observations in X-Ray and Gamma-Ray Astronomy - UCSD 1756, 1966
Summary
- Dates:
- 1966
Constructing and Testing a New Telescope, 1966
Summary
- Dates:
- 1966
Studies for X-Ray, Gamma-Ray, and Infrared Astronomy - UCSD 1962, 1966
Summary
- Dates:
- 1966
Studies for X-Ray, Gamma-Ray, and Infrared Astronomy - UCSD 2313, 1967
Summary
- Dates:
- 1967
Studies for X-Ray, Gamma-Ray, and Infrared Astronomy - UCSD 2697, 1968
Summary
- Dates:
- 1968
X-Ray and Gamma-Ray Astronomy Research - UCSD 5604, 1973
Summary
- Dates:
- 1973
Study of Angular Sizes of Cosmic X-Ray Sources - UCSD 6746, 1974
Summary
- Dates:
- 1974
U.S./Japan Cooperative Research: Study of Angular Sizes of Cosmic X-Ray Sources - UCSD 6746, 1974
Summary
- Dates:
- 1974
Hard X-Ray Photometric and Imaging Observations of Cosmic X-Ray Sources - UCSD 7548A, 1974-1975
Summary
- Dates:
- 1974-1975
Hard X-Ray Photometric and Imaging Observations - UCSD 7548, 1974-1975
Summary
- Dates:
- 1974-1975
Hard X-Ray Photometric and Imaging Observations of Cosmic X-Ray Sources - UCSD 8249, 1975-1976
Summary
- Dates:
- 1975-1976
Hard X-Ray Photometric and Imaging Observations of Cosmic X-Ray Sources - UCSD 8249 2nd rev., 1975-1976
Summary
- Dates:
- 1975-1976
Hard X-Ray Imaging and Photometry of Cosmic X-Ray Sources - UCSD 9147, 1976
Summary
- Dates:
- 1976
Hard X-Ray Photometric and Imaging Observations of Cosmic X-Ray Sources - UCSD 9147, 1976-1977
Summary
- Dates:
- 1976-1977
Hard X-Ray Imaging and Photometry of Cosmic X-Ray Sources - UCSD 3037, 1977
Summary
- Dates:
- 1977
Catalog of Non-Solar X-Ray Observations - UCSD 3628, 1978
Summary
- Dates:
- 1978
Hard X-Ray Spectroscopy and Photometry of Cosmic X-Ray Sources - UCSD 4102, 1978-1979
Summary
- Dates:
- 1978-1979
Balloon Operation - Support for Hard X-Ray Spectroscopic Observations in Conjunction with the SMM - UCSD 5353, 1979
Summary
- Dates:
- 1979
Hard X-Ray Spectroscopy and Photometry of Cosmic X-Ray Sources - UCSD 5310, 1979
Summary
- Dates:
- 1979
Proposal Materials - Hard X-Ray Spectroscopy of Cosmic X-Ray Sources, 1979-1981
Summary
- Dates:
- 1979-1981
An Investigation of Bismuth Germanate for High Energy Remote Sensing - UCSD #6034, 1980
Summary
- Dates:
- 1980
Hard X-Ray Spectroscopy of Cosmic X-Ray Sources - UCSD 7103, 1980
Summary
- Dates:
- 1980
Hard X-Ray Spectroscopy of Cosmic X-Ray Sources - UCSD 7103R, 1980-1981
Summary
- Dates:
- 1980-1981
Support of Southern Hemisphere Balloon Observations - UCSD 7249, 1981
Summary
- Dates:
- 1981
Development of a Standardized Germanium Detector Module for High Resolution Spectroscopy... - UCSD 7266, 1981
Summary
- Dates:
- 1981
Proposal Preparation Plan, 1981
Summary
- Dates:
- 1981
Hard X-Ray Spectroscopy of Cosmic X-Ray Sources - UCSD 7423, 1981
Summary
- Dates:
- 1981
Support of Southern Hemisphere Balloon Observations - UCSD 7250, 1981-1982
Summary
- Dates:
- 1981-1982
X-Ray and Gamma-Ray Spectroscopy of Cosmic Sources - Vol. 1-2 - UCSD 7550, 1981
Summary
- Dates:
- 1981
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources - UCSD 9006, 1982
Summary
- Dates:
- 1982
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources - UCSD 9006R, 1983
Summary
- Dates:
- 1983
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources - UCSD 5795, 1984
Summary
- Dates:
- 1984
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources - UCSD 7006, 1984
Summary
- Dates:
- 1984
Observation of Solar Hard X-Ray Micro-Flares and Flares on a Long Duration Balloon Flight - UCSD 7087, 1985
Summary
- Dates:
- 1985
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources - UCSD 865419, 1985
Summary
- Dates:
- 1985
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources - UCSD 875638, 1986
Summary
- Dates:
- 1986
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources - UCSD 886619, 1988-1989
Summary
- Dates:
- 1988-1989
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources - UCSD 895228, 1988-1989
Summary
- Dates:
- 1988-1989
High Resolution Gamma-Ray and Hard X-Ray Spectrometer (HIREGS) for the MAX91 Long ... - UCSD 895019, 1989-1994
Summary
- Dates:
- 1989-1994
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources - UCSD 905083, 1989
Summary
- Dates:
- 1989
Research in High Energy Astrophysics, 1990
Summary
- Dates:
- 1990
Suppliers and Equipment
Contents
Radioactive sources, 1960-1967
Summary
- Dates:
- 1960-1967
General Dynamics Astronautics proposals, 1962-1964
Summary
- Dates:
- 1962-1964
Pointing controls, 1966-1969
Summary
- Dates:
- 1966-1969
Sites - Southern hemisphere, 1968-1974
Summary
- Dates:
- 1968-1974
Raven Industries, 1972
Summary
- Dates:
- 1972
Instrument Drawings
Contents
University of Minnesota, 1954-1959
Summary
- Dates:
- 1954-1959
International Geophysical Year (IGY), 1955-1958
Summary
- Dates:
- 1955-1958
S -16 balloon gondola, 1960
Summary
- Dates:
- 1960
Scanning phoswich scintillator for solar events, 1960
Summary
- Dates:
- 1960
Pointed gondola electrical, 1961-1965
Summary
- Dates:
- 1961-1965
Flight UCSD 3-50 - Dateland, Arizona, 1963
Summary
- Dates:
- 1963
Testing and Review
Contents
Oscillator tests, 1970
Summary
- Dates:
- 1970
Potting and sealing II, 1970
Summary
- Dates:
- 1970
High Resolution Gamma-Ray Spectroscopy of Cosmic Sources, 1983-1984
Summary
- Dates:
- 1983-1984
UCSD-UCB Balloon Program Review, 1988
Summary
- Dates:
- 1988
Detector Test On Prelaunch, 1989
Summary
- Dates:
- 1989
Normalized background runs with and without shield, 1989
Summary
- Dates:
- 1989
Scanning scintillation - Calculations and diagrams, undated
Summary
- Dates:
- undated
Project notebook - Photomultiplier tube assembly and computations, 1971
Summary
- Dates:
- 1971
Photographs - Equipment and background charts, 1988
Summary
- Dates:
- 1988
Photographs - Balloon gondola, 1993
Summary
- Dates:
- 1993
Flights
Contents
Flight 519 - Report, readings and charts, 1960
Summary
- Dates:
- 1960
Flight M-169 - Report and notes, 1960
Summary
- Dates:
- 1960
Flight 510 - Charts and readings, 1960
Summary
- Dates:
- 1960
Flight 524 - Charts, 1960
Summary
- Dates:
- 1960
Flight N-531 - Reports and charts, 1961
Summary
- Dates:
- 1961
Flight 533 - Report and notes, 1961
Summary
- Dates:
- 1961
Flight M-255 - Report and charts, 1961
Summary
- Dates:
- 1961
Flight UCSD 1-47 - Charts and notes, 1963
Summary
- Dates:
- 1963
Flight UCSD 2-49 - Report and chart, 1963
Summary
- Dates:
- 1963
Data
Contents
Notes and charts, 1958-1976
Summary
- Dates:
- 1958-1976
X-ray burst, 1971
Summary
- Dates:
- 1971
Green notebook 1, 1985-1989
Summary
- Dates:
- 1985-1989
Yellow notebook, 1989
Summary
- Dates:
- 1989
Ascent counting rates, 1989
Summary
- Dates:
- 1989
Blue notebook, 1989
Summary
- Dates:
- 1989
Blue notebook 2, 1989
Summary
- Dates:
- 1989
Elevation and azimuth (uncorrected), 1989
Summary
- Dates:
- 1989
Gray notebook - Cosmic background chart, 1989
Summary
- Dates:
- 1989
Gray notebook, 1989
Summary
- Dates:
- 1989
Green notebook 2, 1989
Summary
- Dates:
- 1989
Green notebook 3, 1989
Summary
- Dates:
- 1989
Miscellaneous displays, 1989
Summary
- Dates:
- 1989
Miscellaneous spectra, 1989
Summary
- Dates:
- 1989
Red notebook, 1989
Summary
- Dates:
- 1989
Red notebook 2, 1992
Summary
- Dates:
- 1992
Blue notebook 3, undated
Summary
- Dates:
- undated
Red notebook 3 - Part 1, undated
Summary
- Dates:
- undated
Red notebook 3 - Parts 2 and 3, undated
Summary
- Dates:
- undated
Results
Contents
Advances in Gamma-Ray Line Astronomy, 1983
Summary
- Dates:
- 1983
Anomalous Energy Spectrum of Protons in the Earth's Radiation Belt, 1964
Summary
- Dates:
- 1964
Balloon Observations of X-Rays for Scorpius and from the Crab Nebulae, 1966
Summary
- Dates:
- 1966
Balloon X-Ray Astronomy, 1967
Summary
- Dates:
- 1967
Compton Backscattered 511 KeV Annihilation Line …, 1991
Summary
- Dates:
- 1991
Cosmic Gamma-Ray Lines: Theory, 1980
Summary
- Dates:
- 1980
Cosmic Ray Conference - Notes and viewgraphs, 1988
Summary
- Dates:
- 1988
COSPAR talk, 1984
Summary
- Dates:
- 1984
Design and Performance of an Actively Collimated Phoswich System, 1976
Summary
- Dates:
- 1976
Drift Velocity of Trapped Particles, 1964
Summary
- Dates:
- 1964
Effects of High Energy Radiations of Noise Pulses from Photomultiplier Tubes, 1967
Summary
- Dates:
- 1967
Energy Spectrum of Diffuse Component of Cosmic Soft Gamma-Rays, 1975
Summary
- Dates:
- 1975
Experiments in X-Ray and Gamma-Ray Astronomy, 1965
Summary
- Dates:
- 1965
Galactic Center 511 Line, 1990
Summary
- Dates:
- 1990
Gamma-Ray Line Astronomy, 1979
Summary
- Dates:
- 1979
Gamma-Ray Line Astronomy, 1980
Summary
- Dates:
- 1980
Gamma-Ray Line Spectrum of the Crab Nebula, 1969
Summary
- Dates:
- 1969
Gamma-Ray Spectroscopy: An Historical Perspective, 1988
Summary
- Dates:
- 1988
Hard X-Ray Pulse Profile of the Transient Source …, 1976
Summary
- Dates:
- 1976
Instrumental Background in Balloon-Borne Gamma-Ray Spectrometers, 1985
Summary
- Dates:
- 1985
Instrumental Technique in X-Ray Astronomy, 1975
Summary
- Dates:
- 1975
National Center for Atmospheric Research - Annual Balloon Report, 1963-1969
Summary
- Dates:
- 1963-1969
Observation of Annihilation Radiation from the Galactic Center Region, 1990
Summary
- Dates:
- 1990
Observations of Cosmic X-Ray Sources in the 10 - 250 KeV Range, 1967
Summary
- Dates:
- 1967
Observations of SN 1987A and the Galactic Center …, 1990
Summary
- Dates:
- 1990
Observation of the Galactic Center Region, 1989-1991
Summary
- Dates:
- 1989-1991
Origin of the Annihilation Radiation from the Galactic Center Region, 1989
Summary
- Dates:
- 1989
Research in High Energy Astrophysics - Final Report - NASA - NAGW 1837, 1993
Summary
- Dates:
- 1993
Search for Gamma-Ray Line Emissions in the Crab Nebula, 1968
Summary
- Dates:
- 1968
Search for Hard X-Rays from Extragalactic Objects, 1972
Summary
- Dates:
- 1972
Search for the Quiet Time Solar Gamma-Rays, 1966
Summary
- Dates:
- 1966
SMM Detection of Diffuse Galactic 511 KeV Annihilation Radiation, 1988
Summary
- Dates:
- 1988
Spectroscopy in the 10 KeV to 10 MeV Range, 1981
Summary
- Dates:
- 1981
Spectrum of Scorpius XR-1 to 50 KeV, 1966
Summary
- Dates:
- 1966
Spectrum of Crab Nebula X-Rays to 120 KeV, 1966
Summary
- Dates:
- 1966
Techniques in Balloon X-Ray Astronomy, 1971
Summary
- Dates:
- 1971
Upper Limit Solar Gamma-Ray Spectrum to 10 MeV, 1966
Summary
- Dates:
- 1966
Upper Limits for CP 1919 X-Ray Emission, 1970
Summary
- Dates:
- 1970
X-Ray and Gamma-Ray Spectroscopy of Cosmic Sources, 1981
Summary
- Dates:
- 1981
X-Ray Observations of the Crab Nebula, 1970
Summary
- Dates:
- 1970
SPACE SHUTTLE - SPACELAB
Background
- Scope and content:
-
Series 14) SPACE SHUTTLE – SPACELAB: The Spacelab was a small laboratory designed to fit inside the Space Shuttle's cargo bay, otherwise called the payload bay. A joint effort between NASA and the European Space Agency (ESA), it was designed to support and expose experiments to space. Arranged in five subseries: A) Planning, B) Correspondence, C) HXRI – FDT, D) Proposals, and E) General.
Contents
Planning
Contents
Bellcom documents, 1972
Summary
- Dates:
- 1972
Proceedings of the Space Shuttle Sortie Workshop - Volume 1, 1972
Summary
- Dates:
- 1972
Proceedings of the Space Shuttle Sortie Workshop - Volume 2, 1972
Summary
- Dates:
- 1972
Working Group Meeting Materials, 1972-1973
Summary
- Dates:
- 1972-1973
Spacelab Views of the ESRO Spacelab Payload Groups Utilization of the Spacelab for Science, 1973
Summary
- Dates:
- 1973
Final Report of the Space Shuttle Payload Planning Working Groups, 1973
Summary
- Dates:
- 1973
Activation Definition, 1974
Summary
- Dates:
- 1974
Meetings Minutes, 1975
Summary
- Dates:
- 1975
Announcement of Research Opportunity, 1975-1976
Summary
- Dates:
- 1975-1976
Experiments, 1975
Summary
- Dates:
- 1975
Spacelab MTM Feasibility Study, 1975
Summary
- Dates:
- 1975
Ground Data Processing Parametric Requirements, 1975
Summary
- Dates:
- 1975
Programme Requirements, 1975
Summary
- Dates:
- 1975
Instrument Control Requirements, 1975
Summary
- Dates:
- 1975
Shuttle payload potentials, 1975
Summary
- Dates:
- 1975
Shuttle Optical Telescope, 1975-1976
Summary
- Dates:
- 1975-1976
OFT mission Analysis, 1975
Summary
- Dates:
- 1975
Atmosphere Magnetosphere and Plasma in Space, 1976
Summary
- Dates:
- 1976
Index system, 1976
Summary
- Dates:
- 1976
Hard X-Ray Imaging Facility for Space Shuttle, 1976
Summary
- Dates:
- 1976
Gamma-Ray and Neutron Experiments, 1977
Summary
- Dates:
- 1977
Conceptual Studies for Scientific Trade-Offs, 1977
Summary
- Dates:
- 1977
FDT - Hard X-Ray Imaging Instrument, 1977-1978
Summary
- Dates:
- 1977-1978
External Tanks Workshop, 1982
Summary
- Dates:
- 1982
Pinhole-Occulter Facility, 1982
Summary
- Dates:
- 1982
Correspondence
Contents
General, 1976
Summary
- Dates:
- 1976
Outside Working Group - Instrument control, 1975
Summary
- Dates:
- 1975
Outside Working Group - Solar physics, 1974-1975
Summary
- Dates:
- 1974-1975
Within Working Group - Instrument control, 1975
Summary
- Dates:
- 1975
Within Working Group - Solar physics, 1975
Summary
- Dates:
- 1975
HXRI - FDT
Contents
Reports - Informal - Hard X-Ray Imaging Facility Definition Team (HXRI-FDT) members, 1974-1976
Summary
- Dates:
- 1974-1976
Team proposals, 1974-1976
Summary
- Dates:
- 1974-1976
Scientific Definition - Instrument requirements, 1974-1976
Summary
- Dates:
- 1974-1976
Correspondence contact, 1975-1976
Summary
- Dates:
- 1975-1976
Documents and address list, 1975-1976
Summary
- Dates:
- 1975-1976
Team communications with NASA, 1975-1976
Summary
- Dates:
- 1975-1976
Meeting 1 - UCSD, 1975
Summary
- Dates:
- 1975
Correspondence members, 1975-1976
Summary
- Dates:
- 1975-1976
Reports - Informal from HXIFDT members - letters, 1975-1976
Summary
- Dates:
- 1975-1976
Scientific definition - Interface requirements, 1975-1976
Summary
- Dates:
- 1975-1976
Correspondence - Miscellaneous, 1975-1976
Summary
- Dates:
- 1975-1976
Reports - Informal, 1975
Summary
- Dates:
- 1975
Information transmittals, 1975
Summary
- Dates:
- 1975
Meeting 2 - Cal Tech, 1975
Summary
- Dates:
- 1975
Contract, 1975
Summary
- Dates:
- 1975
Meeting 3 - GSFC, 1975
Summary
- Dates:
- 1975
Scientific Tradeoff Study - Hurford, 1975-1976
Summary
- Dates:
- 1975-1976
Meeting 4 - San Diego, 1975
Summary
- Dates:
- 1975
Meeting 5 - Berkeley, CA, 1975
Summary
- Dates:
- 1975
Information transmittals, 1975-1976
Summary
- Dates:
- 1975-1976
BBRC - Engineering Study - Proposal, 1975
Summary
- Dates:
- 1975
BBRC - Engineering Study - Correspondence, 1975-1976
Summary
- Dates:
- 1975-1976
Meeting 6 - BBRC, 1975
Summary
- Dates:
- 1975
Document list, 1975-1976
Summary
- Dates:
- 1975-1976
Balloon modulation collimator, 1976
Summary
- Dates:
- 1976
Meeting 7 - BBRC, 1976
Summary
- Dates:
- 1976
Correspondence - BBRC, 1976
Summary
- Dates:
- 1976
Information transmittals, 1976
Summary
- Dates:
- 1976
Reports - Informal - UCSD to members, 1976
Summary
- Dates:
- 1976
Grid manufacturer - Correspondence, 1976-1977
Summary
- Dates:
- 1976-1977
Meeting 8 - BBRC, 1976
Summary
- Dates:
- 1976
Information transmittals, 1976
Summary
- Dates:
- 1976
Presentations - NASA, 1976
Summary
- Dates:
- 1976
Meeting 9 - BBRC, 1976
Summary
- Dates:
- 1976
Information transmittals, 1976
Summary
- Dates:
- 1976
BBRC - Engineering Study - Final Report, 1976
Summary
- Dates:
- 1976
Scientific Definition - Institutional requirements, 1976
Summary
- Dates:
- 1976
Structural and Thermal Study - Proposal, 1976
Summary
- Dates:
- 1976
Alignment facilities, 1976
Summary
- Dates:
- 1976
Correspondence - Members, 1976
Summary
- Dates:
- 1976
Correspondence - NASA, 1976
Summary
- Dates:
- 1976
Balboa Facility, 1976
Summary
- Dates:
- 1976
Meeting 10, 1976
Summary
- Dates:
- 1976
Scientific Trade-off Report, 1976
Summary
- Dates:
- 1976
Meeting 11 - GSFC, 1977
Summary
- Dates:
- 1977
Structural and Thermal Study - Final report, 1977
Summary
- Dates:
- 1977
Meeting 12 - UCSD, 1977
Summary
- Dates:
- 1977
Minutes - Meeting 14, 1976-1978
Summary
- Dates:
- 1976-1978
Solar Physics Special Purpose FDT - Projects and minutes, 1976-1978
Summary
- Dates:
- 1976-1978
Final Meeting, 1978
Summary
- Dates:
- 1978
Structural and Thermal Study - Correspondence, 1978
Summary
- Dates:
- 1978
Proposals
Contents
Hard X-Ray Imaging Instrument - Executive Summary - SP-78-03, 1978
Summary
- Dates:
- 1978
High Resolution X-Ray and Gamma-Ray Spectrometer for Spacelab - UCSD 4497, 1974-1980
Summary
- Dates:
- 1974-1980
Definition Study for Hard Solar X-Ray Imaging for Spacelab - UCSD 7507, 1974-1976
Summary
- Dates:
- 1974-1976
Hard X-Ray Facility Definition Team - UCSD 7507R, 1975-1976
Summary
- Dates:
- 1975-1976
Modification to Contract NAS 5-22375 - Hard X-Ray Imaging FDT - Engineering Configuration Study - UCSD 8605, 1976
Summary
- Dates:
- 1976
Modification to Contract NAS 5-22375 - Hard X-Ray Imaging FDT - UCSD 8196, 1976
Summary
- Dates:
- 1976
3-200 KeV Scanning X-Ray Spectrometer - UCSD 8996, 1976
Summary
- Dates:
- 1976
Hard X-Ray FDT - UCSD 9231R, 1976-1977
Summary
- Dates:
- 1976-1977
3-200 KeV Scanning X-Ray Spectrometer for Spacelab I - UCSD 8996, 1976-1981
Summary
- Dates:
- 1976-1981
Orbital Flight Test, 1976
Summary
- Dates:
- 1976
Hard X-Ray Imaging Instrument for the Spacelab 2 Mission, 1976
Summary
- Dates:
- 1976
High Resolution X-Ray and Gamma-Ray Spectrometer, 1976
Summary
- Dates:
- 1976
Hard X-Ray Imaging System for Spacelab 2 v.1 - UCSD 9397 - Part 1, 1976
Summary
- Dates:
- 1976
Hard X-Ray Imaging System for Spacelab 2 v.2 - UCSD 9397 - Part 2, 1976
Summary
- Dates:
- 1976
Wide Band Imaging Spectrophotometer for Spacelab 2 - UCSD 9398, 1976
Summary
- Dates:
- 1976
Hard X-Ray Imaging System for an Orbital Flight Test Mission - UCSD 9401, 1976
Summary
- Dates:
- 1976
Radiation Environment Monitor for Orbital Flight Test 4 - UCSD 9399, 1976
Summary
- Dates:
- 1976
Simple Pointing System for Wide-Field Instrumentation on Space Shuttle - UCSD 9899, 1977
Summary
- Dates:
- 1977
Proposal for a High Resolution X-Ray and Gamma-Ray Spectrometer for the Spacelab 2 Mission - UCSD 9400, 1977-1981
Summary
- Dates:
- 1977-1981
Hard X-Ray Imaging Instrument - UCSD SP-78-03, 1978
Summary
- Dates:
- 1978
Modification to Contract NAS 522375 - UCSD 3833, 1978
Summary
- Dates:
- 1978
Wide-Band Spectrophotometer for Studies of Cosmic X-Ray Sources, 1978
Summary
- Dates:
- 1978
High Resolution X-Ray and Gamma-Ray Spectrometer for Spacelab - UCSD 4497, 1978
Summary
- Dates:
- 1978
High Resolution X-Ray and Gamma-Ray Spectrometer for Spacelab - UCSD 5821, 1980
Summary
- Dates:
- 1980
Scientific Trade-offs in Pinhole-Occulter Facility Accomodation - UCSD 886585, 1988
Summary
- Dates:
- 1988
Scientific Requirements for the Accommodation of the Pinhole-Occulter Facility on the Spacestation Freedom - UCSD 895983, 1989-1990
Summary
- Dates:
- 1989-1990
Pinhole-Occulter Facility - A Scientific Concept Study for the Spacestation Freedom - UCSD 895250, undated
Summary
- Dates:
- undated
General
Contents
Suppliers and Equipment - Hard X-Ray Imaging Instrument - Viewgraphs, 1976
Summary
- Dates:
- 1976
Suppliers and Equipment - Hard X-Ray Imaging Instrument, 1976
Summary
- Dates:
- 1976
Testing and Review - Solar and Contamination Control Experiment, 1975
Summary
- Dates:
- 1975
Testing and Review - Advanced Experiments, 1975
Summary
- Dates:
- 1975
Testing and Review - Instrument Control - Reports, 1975-1976
Summary
- Dates:
- 1975-1976
Testing and Review - Hard X-Ray Imaging Instrument - Viewgraphs, 1976
Summary
- Dates:
- 1976
Testing and Review - Spacelab Multiuser Instrument Review, 1978
Summary
- Dates:
- 1978
Testing and Review - Temperature aperture modulation, undated
Summary
- Dates:
- undated
Results - Instrument control - Informal report, 1975
Summary
- Dates:
- 1975
Results - Pinhole Occulter Facility, 1981
Summary
- Dates:
- 1981
Results - Solar Physics - Informal Report, 1975-1976
Summary
- Dates:
- 1975-1976
MEETINGS AND CONFERENCES
Background
- Scope and content:
-
Series 15) MEETINGS AND CONFERENCES: Includes meeting notices, correspondence, workshop materials, and memoranda. Arranged alphabetically by event name.
Contents
Notices of meetings, 1972-1979
Summary
- Dates:
- 1972-1979
Notices of meetings, 1980
Summary
- Dates:
- 1980
American Astronomical Society (AAS) Meetings, including Solar Physics Division, 1969-1972, 1975-1976, 1985
Summary
- Dates:
- 1969-1972, 1975-1976, 1985
American Geophysical Union (AGU) Meetings, 1968, 1971-1972
Summary
- Dates:
- 1968, 1971-1972
American Physical Society (APS), 1967
Summary
- Dates:
- 1967
CalSpace Grant Consortium Meetings, 1987-1990
Summary
- Dates:
- 1987-1990
Committee on Space Research (COSPAR) - Symposium on Fast Transients in X-Ray and Gamma-Rays, 1975
Summary
- Dates:
- 1975
COSPAR - Budapest office file folder and travel information, 1980
Summary
- Dates:
- 1980
COSPAR - Meetings, 1987-1988
Summary
- Dates:
- 1987-1988
CIT - Galactic Center Workshop, 1982
Summary
- Dates:
- 1982
European Science Agency (ESA) Meetings, 1984-1989
Summary
- Dates:
- 1984-1989
European Science Foundation - Correspondence and meetings, 1984-1986
Summary
- Dates:
- 1984-1986
High Energy Management Operations Working Group (HEAMOWG) Meetings, 1989-1991
Summary
- Dates:
- 1989-1991
HEAMOWG Correspondence, 1989-1992
Summary
- Dates:
- 1989-1992
International Astronomical Union (IAU) - Foreign travel, 1970
Summary
- Dates:
- 1970
International Cosmic Ray Conference (ICRC) - 21st meeting papers - Reprints of conference papers by Matteson, Ramaty and Lingenfelter, 1990
Summary
- Dates:
- 1990
National Academy of Sciences (NAS) - Space Science Board - Solar Physics Summer Study, 1975
Summary
- Dates:
- 1975
NAS - Surveys and studies, 1975
Summary
- Dates:
- 1975
Orbiting Solar Observatory (OSO) Satellite Working Group, 1969
Summary
- Dates:
- 1969
Orbiting Solar Observatory (OSO) Workshop, 1972
Summary
- Dates:
- 1972
NASA - Symposium on the Prospects for Gamma-Ray Spectroscopy in Astrophysics, 1978
Summary
- Dates:
- 1978
Santa Cruz Workshop - Gamma-Ray Burst Bibliography, 1983
Summary
- Dates:
- 1983
Space Science Working Group, 1988-1991
Summary
- Dates:
- 1988-1991
Space Science Board Meetings, 1984-1985
Summary
- Dates:
- 1984-1985
STIP Workshop - Travel - UCSD 7018, 1984-1986
Summary
- Dates:
- 1984-1986
UC Astronomy Meeting, 1983
Summary
- Dates:
- 1983
UK Science Research Council - Symposium on the Techniques of Solar and Cosmic X-Ray Spectroscopy, 1975
Summary
- Dates:
- 1975
X-Ray Binaries Symposium, 1975
Summary
- Dates:
- 1975
X-Ray Gamma-Ray Solar Physics Group - Memoranda, 1968-1978
Summary
- Dates:
- 1968-1978
X-Rays in Space Meeting, 1974
Summary
- Dates:
- 1974
ORIGINALS OF PRESERVATION PHOTOCOPIES
Background
- Scope and content:
-
Series 16) ORIGINALS OF PRESERVATION PHOTOCOPIES: Original photographs of the High Energy Astronomy Group were photocopied for use. The photocopies are present throughout the collection, and the originals are located in this series.